BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 23, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of a medical facility in Dallas, Texas. Completed plans call for the renovation of a medical facility.

https://www.dallasnews.com/news/2026/03/20/dallas-county-wants-to-borrow-350m-for-slew-of-projects-including-land-for-new-jail/ Dallas County wants to borrow $350M for slew of projects, including land for new jail Officials will vote on issuing the bonds, which amount to $688M with interest, after a 45-day notice period. New jail site has not been disclosed. The Margaret Hunt Hill Bridge is seen above the Lew Sterrett Justice Center with North Tower... The Margaret Hunt Hill Bridge is seen above the Lew Sterrett Justice Center with North Tower Detention Facility and Frank Crowley Courts Building as seen from the roof of Reunion Tower on Tuesday, Dec. 29, 2020, in Dallas. Smiley N. Pool / Staff Photographer Dallas County officials are preparing to borrow hundreds of millions of dollars to fund a slew of capital projects, the highest ticket item being land acquisition for a new jail. The Commissioners Court voted unanimously Friday to advertise its intent to issue $350 million in bonds, which would amount to $688 million with interest repaid through property taxes over the next several decades. Commissioners will decide whether to issue the bonds after a 45-day disclosure period required by state law. County officials defended the financing as necessary to fund public projects and services after a period of relatively little borrowing and a pay-as-you-go strategy. “We go into a little bit of debt, but the bang for the buck for the citizen is tremendous,” Dallas County Judge Clay Lewis Jenkins said. The borrowing plan includes the county’s push for a new jail, though officials have not disclosed a confirmed location during their search. A consultant in 2024 said the Lew Sterrett Justice Center is outdated and inefficient and estimated building a new jail with 7,200 beds will cost $5.3 billion by 2032. The jail on Friday was at 95% of its 7,499-bed capacity, which includes temporary beds, according to criminal justice department data. Without the proposed bond package, the county would pay off its existing debt and interest of $240 million by 2042, said county Administrator Darryl Martin. With an increasing population, Jenkins said the county must step up to assist with needs related to homelessness, public health and growth, which often falls to cities. He said Dallas County fares better than other large metro areas in the U.S. on debt and taxes. Among 25 comparable counties in Texas, Dallas County had the lowest debt per capita in 2023, according to a report prepared by consultants. “We’ve been extremely frugal with regards to the management of what I’m calling public credit,” Commissioner John Wiley Price said. The proposed bond package would fund: $60 million for land purchase and site development for a new jail. $50 million for construction of a new District 3 Road and Bridge facility. $50 million for construction of a new District 4 Road and Bridge facility. $50 million for renovations at the Old Red Courthouse. $50 million for construction of a fire station and home collection center building. $25 million for construction of a deflection center in District 2, where law enforcement could bring suspects of low-level crimes for stabilization instead of jail. $25 million for Health and Human Services renovations. $25 million for deferred maintenance on other needs. $10 million for the East Dallas Government Center under construction. $5 million for acquisition and installation of electric vehicle charging stations. In January, the commissioners approved spending $55 million for land acquisition for replace the aging jail, which would later be reimbursed to the county through issuance of bonds. ----------------------------------------- Reference Number 0000407995 This one-time construction contract project is located at the Health and Human Services Building, 2377 North Stemmons Freeway, Dallas, TX 75207, and consists of replacing the existing main electrical switchboard. All work must be completed in one weekend. The specific weekend will be designated by Dallas County Personnel to the winning contractor. All work must begin after 6:00PM CST on Friday and the switchboard and all components must be back online, complete, and fully operational by 5:00 AM CST Monday morning. Participation Requirements - Small Business Participation General Requirements - FOB Destination - Insurance Required Question Deadline 02/09/2026 at 2:00 PM CT Questions are submitted online Yes , All questions regarding this solicitation are to be submitted in writing to John Wysocki, Dallas County Purchasing Department via online , questions in writing via email to john.wysocki@dallascounty.org. . Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Pre-bid Meeting Notes : https://gcc02.safelinks.protection.outlook.com/ap/t-59584e83/url=https%3A%2F%2Fteams.microsoft.com%2Fl%2Fmeetup-join%2F19%253ameeting_Y2QyNTk1YWUtOTJiYy00MDNjLTg5ODItZmY4NGQwZmIxMWQx%2540thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%252251adcfad-72f1-479c-b28f-52412e04014b%2522%252c%2522Oid%2522%253a%25226f7e6e0d-1f84-43a8-a037-c8b93e424cb8%2522%257d&data=05%7C02%7CJohn.Wysocki%40dallascounty.org%7C93ee5e2f03fd4b03c65208de4c6d3197%7C51adcfad72f1479cb28f52412e04014b%7C0%7C0%7C639032229054454127%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=r5Pp%2B%2BwXG%2BWUruLS%2BfNtavyDJUT2YWKzj0vvxxs3wR4%3D&reserved=0 Meeting ID: 270 149 073 756 53 Passcode: aj3cU9JU Dial in by phone. +1 469-208-1731, 608652175# United States, Carrollton bid open notes : Bids will be publicly opened in compliance with public bid opening statutory requirements.

Post-Bid

Medical

$200,000.00

Public - County

Renovation

18

5

17

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
448
Active Projects
189
Bidding Soon
4,490
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2026

March 26, 2026

Project location map

2377 N Stemmons Fwy, Dallas, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.