BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2026 at 7:00 PM

Updated January 21, 2026

Site work and paving for a mixed-use development in Taylor, Texas. Completed plans call for site work for a sidewalk / parking lot; road / highway; for paving for a sidewalk / parking lot; and road / highway.

The project work includes replacement of portions of the curb and gutter along Kirk Street, Hackberry Street, Branch Street, and Fowzer streets. Identified existing deficient curb and gutter sections will be removed, and the installation of compacted flexbase, new curb and gutter, new driveway portions will be installed. Work subsidiary to the curb and gutter replacement, include mobilization and revegetation. The bid will be awarded to the Lowest responsible bidder meeting specifications. The City intends to award this contract to one (1) contractor. Question Deadline 01/21/2026 at 5:00 PM CT Please send questions to: Conor Stuart Municipal Engineer 737-230-7318 conor.stuart@hdrinc.com . The right is reserved to accept or reject all or part of the bid, and to accept the offer considered most advantageous to the city by item or total bid. The City of Taylor will award to the lowest possible bidder or bidder who provides goods and services at the best value to the city. The project work includes the replacement of 2500 linear feet of curb and gutter along 5 street segments in the City of Taylor. There will not be a pre-bid meeting for this project The project work includes replacement of portions of the curb and gutter along Kirk Street, Hackberry Street, Branch Street, and Fowzer streets. Identified existing deficient curb and gutter sections will be removed, and the installation of compacted flexbase, new curb and gutter, new driveway portions will be installed. Work subsidiary to the curb and gutter replacement, include mobilization and revegetation. The bid will be awarded to the Lowest responsible bidder meeting specifications. Contractor is to: o Remove and Replace 2500 LF of existing curb and gutter per the attached exhibits and City of Taylor Detail PV007 Sawcut, subsidiary to concrete removal, at identified locations and haul off existing concrete material. o Remove and replace 60 SY of driveway gutter pan per the attached exhibits and City of Taylor Detail PV005 Driveway gutter pan extends from edge of asphalt two feet towards the ROW line. Sawcut, subsidiary to concrete removal, at identified locations and haul off existing concrete material. o Remove existing base material and replace with 1200 SY of 8" compacted flex base from edge of asphalt to 2' behind back of proposed curb. Removal of existing base subsidiary to install flex base bid item. Mobilization and revegetation are subsidiary to the concrete curb and gutter installation. All concrete work shall follow the City of Taylor Standard Details, attached to this bid document and Engineering Manual. Traffic control will be set up the City of Taylor Public Work Department.

GC Bidding

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

4

6

4

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
258
Active Projects
120
Bidding Soon
2,491
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.