BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 9, 2026 at 7:00 PM

Updated February 10, 2026

Renovation of a fire / police facility in Baltimore, Maryland. Completed plans call for the renovation of a fire / police facility.

TPO Roof Layover - 3220 Frederick Avenue - BCFD #30 Question Deadline 01/23/2026 at 2:00 PM ET Online Portal No Pre-Bid Conference Data Found 1. Provide all labor, materials, equipment and facilities to perform a TPO layover of the existing roof on a 2-bay firehouse located near the intersection of Frederick and Caton Aves. in SW Baltimore. 2. Prepare the existing modified bitumen roof at 3220 Frederick Ave. in accordance with the TPO manufacturer's recommendations to achieve a 20-year unlimited warranted roof when completed. Perform factory inspections as needed for warranty and include all manufacturer's costs to provide a "20yr. no dollar limit" warranty. 3. Make wood deck repairs if needed with _" plywood and make flush using coverboard. 4. Cover existing roof membrane with GAF SA Vapor Retarder XL. 5. Install 1/2" J-M ProtectoR HD (2.5 R) polyiso coverboard (or equal) mechanically fastened thru existing roof layers to wood deck beneath using TPO manufacturer's recommended fasteners, adhesives and methods. 6. Install GAF .060 TPO (white or other standard color, thermoplastic polyolefin) single layer roof membrane by GAF, Mule Hide (or approved equal). Use TPO manufacturer's vertical wall and chimney flashings with termination bar, TPO/aluminum drip edge and TPO boots at penetrations; use a TPO manufacturer's termination flashing accessory at all TPO membrane edges or terminations. 7. Evaluate existing gutters and downspouts to remain. Repair or replace as needed and ensure downspouts are open from gutter to grade and through rain leaders to curb or storm inlets. 8. Install new bronze .027 aluminum coping and fascia at parapet walls. 9. Masonry chimneys will be repointed by others as needed prior to the work in this contract. 10. Ensure positive flow to all gutters and downspouts. 11. Provide 20-year no dollar limit manufacturer's warranty for materials and labor on TPO overlay roof. 12. All areas are to be kept clean and free from debris and all debris removed completely from the site each day. The station will remain operational during this work and no interference with BCFD daily operations can be permitted. 13. Reference Marren Architects Spec Section 075400 - TPO Roof.

Post-Bid

Fire / Police

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
4
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2026

March 9, 2026

Project location map

3220 Frederick Ave, Baltimore, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.