Published March 31, 2026 at 8:00 PM

Updated April 1, 2026

Site work for a water / sewer project in Greenville, South Carolina. Completed plans call for site work for a water / sewer project.

o Thoroughly clean all existing sewers in the Contract including complete silt, sand, root, grease and tuberculation removal and perform closed circuit television inspections (CCTV) of the sewers. The cleaning and CCTV requirement applies to sewers being lined with cured-inplace pipe lining o For sewers being lined with CIPP, perform dye testing and/or flush testing to identify active service laterals connecting to the sewer as necessary and/or as directed by the Engineer. Identify active laterals by street address on the CCTV videos and logs. o Perform point repairs to the sewers as determined to be necessary by the Engineer during review of the Contractor's CCTV data. o Install CIPP in the existing sewers as specified on the Drawings and/or by the Engineer. o Rehabilitate active service laterals as specified by the Engineer via replacement or CIPP lining including installing cleanouts where directed. The Engineer will primarily determine defective laterals to be rehabilitated from review of the Contractor's CCTV information. o Rehabilitate existing manholes as specified on the Drawings and/or as directed by the Engineer. o Perform acceptance testing including post-rehabilitation CCTV inspections of the installed CIPP, CIPP and manhole rehab product testing, and vacuum testing of rehabilitated manholes. o Perform other miscellaneous work including complete restoration. Funding through the State Revolving Fund (SRF) in South Carolina will be used to fund all or part of this project. As a result, the project will be subject to federal contracting requirements associated with the funding. In anticipation of these funds, ReWa will apply federal contracting requirements and will be responsible for oversight of these requirements. This project will also have Davis Bacon, Build America, Buy America (BABA) and American Iron and Steel requirements. Question Deadline 01/22/2026 at 5:00 PM ET Online Q&A Yes Liquidated Damages $1000 per day Project Duration 245 days License Requirements WL Response Types Line Items Type of Award Lump Sum

Award

Water / Sewer

$2,987,259.00

Public - City

Site Work

14

11

2

6

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
2
Bidding Soon
752
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2026

April 13, 2026

Project location map

Multiple Locations, Greenville, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.