BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2026 at 7:00 PM

Updated January 24, 2026

Site work and new construction of an educational facility in Carlsbad, California. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Reference Number 00004089 Question Deadline 01/16/2026 at 4:00 PM PT Questions are submitted online Yes This Proposal is Step 2 of the Three-Step process where Project funds exceed $500,000. Step 1, Request for Qualifications, determine qualified Offerors that received this Request for Proposal (RFP). Submission of a proposal is limited exclusively to Offerors who meet the qualification requirements established by the Owner. This RFP is not an open solicitation, and proposals will only be accepted from firms that have been determined to be qualified in accordance with the criteria and procedures outlined in the solicitation documents and applicable procurement regulations. Firms that have not met the qualification requirements, or that have not been identified as eligible Offerors, are not permitted to submit a proposal for this CMAR RFP. General Requirements - License Required - Prevailing Wage Required For questions regarding the selection process: Crystal Gonzalez 408 N. Canyon Street Carlsbad, NM 88220 575-234-3300 crystal.gonzalez@carlsbadschools.net This project consists of two primary components: 1. Construction of a New High School Facility designed to accommodate approximately 2,000 students. 2. Renovation and Remodeling of "The Main" Building, a multi-story structure containing 69,140 square feet, to ensure compliance with current building codes, accessibility standards, and design requirements. The combined work shall deliver a modern, safe, and functional educational campus that supports 21stcentury learning environments, fosters community engagement, and provides flexibility for future growth. a. New High School Construction o Site Preparation and Development o Surveying, grading, and preparation of site infrastructure. o Installation of utilities including water, sewer, storm drainage, natural gas, electrical, data, and telecommunications. o Construction of access roads, parking areas, bus loops, student drop-off/pick-up zones, fire lanes, and site lighting. o Landscaping, irrigation, signage, fencing, and outdoor learning/recreation spaces. o Building Design & Construction o New high school building designed to accommodate ~2,000 students. o Spaces to include but not be limited to: - General classrooms, specialized labs, and collaborative learning areas. - Administration and counseling offices. - Performing Arts Program - Black Box Theater - Media center/library and technology support spaces. -Cafeteria and full-service kitchen. - Maintenance, custodial, and storage areas. o Integration of energy-efficient systems, mechanical/electrical/plumbing (MEP) infrastructure, fire protection, and security/access control. Construction compliant with applicable building codes, ADA standards, and educational design guidelines. b. Renovation of "The Main" Building (69,140 sq. ft.) o Interior Remodeling o Selective demolition and abatement of outdated or non-compliant systems/materials. o Renovation of classrooms, offices, common spaces, and restrooms to meet current accessibility, safety, and functionality standards. o New finishes, flooring, ceilings, and lighting where required. o Upgrades to technology, data, and communications infrastructure. o Building Systems o Replacement/upgrade of HVAC, plumbing, and electrical systems as needed. o Fire alarm, life safety, and sprinkler system upgrades to meet current codes. o Installation of modernized security systems and controlled entry points. o Exterior and Structural Improvements o Building envelope repairs including roofing, windows, and exterior walls as required. o Code-compliant accessibility improvements (ramps, elevators, entrances). o Site improvements immediately adjacent to the building (walkways, lighting, landscaping). c. Demolition of existing buildings as required to make way for the New High School

Post-Bid

Educational

$11,950,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
685
Active Projects
319
Bidding Soon
3,338
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2026

July 1, 2027

Project location map

3557 Monroe St, Carlsbad, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.