Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 2, 2026 at 7:00 PM
Updated February 5, 2026
New construction, renovation and addition to a mixed-use development in Dallas, Texas. Completed plans call for the addition of a 51,437-square-foot, two-story above grade office development; educational facility; library; office development; for the construction of a educational facility; and for the renovation of a educational facility.
Scope of Work. The Work consists of ORG 388 - Dr. Frederick D. Haynes III Global Preparatory Academy At Paul Quinn College - Renovation And Addition - Project consists of the following 1. Renovation of existing basement. Update Library, office, restrooms. Floor, lighting, finishes, fixtures, glazing, and furniture. 2. New ground up Academy building construction for 300 students. The project consists of the following: renovation of the existing basement including updates to the library, office, and restrooms, with work on flooring, lighting, finishes, fixtures, glazing, and furniture; and new ground-up construction of an academy building for 300 students. The project is for new construction for a new high school academy for 300 students on a site on the campus of Paul Quinn College, with gymnasium, classrooms, offices, elevator, gymnasium, and kitchen and dining areas. The school will be two stories in height including but not limited to exterior metal paneling, storefront glazing and masonry veneer, concrete foundation slab with partial crawlspace, steel frame structural construction and metal stud backup, ICF panels at the ICC 500 rated gymnasium storm shelter, roofing, mechanical, electrical, plumbing food service, technology, security, fire protection, and other systems work. The site includes new parking lot and driveways, lighting, retaining wall, landscaping and irrigation and other work. Provide all systems and components for a complete project, and all associated work. Question Deadline 1/23/26 Question Responses from the District 1/30/26 Total Estimated Construction Budget (CCL + IC+ Allowances) for CSP 250049 $32,278,423.90
Post-Bid
Educational
$7,000,000.00
Public - City
Addition, New Construction, Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 4, 2026
April 6, 2026
3837 Simpson Stuart Rd, Dallas, TX
Related To This Project
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Jan 28 2026
Dallas, TX
--
Dallas, TX
Bid Date: Jan 13 2026
Dallas, TX
--
Dallas, TX
Bid Date: Jan 30 2026
Dallas, TX
--
Dallas, TX
Bid Date: Jan 13 2026
Dallas, TX
Bid Date: Jan 30 2026
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Jan 09 2026
Dallas, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
