BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 6, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a fire / police facility in River Forest, Illinois. Completed plans call for the renovation of a fire / police facility.

As of April 06, 2026,project was awarded to Anchor Mechanical Inc, awarded amount is $168,162.63. The purpose of this project is to replace RTU #2, install an i-VU Building Automation System, acoustic barrier, and related equipment located on the roof of the Village Hall at 400 Park Avenue, River Forest, Illinois. The project includes the replacement of one (1) packaged rooftop unit (RTU) in accordance with manufacturer requirements. The unit being replaced is a Trane 27.5-ton packaged RTU; the new unit should be of equal or greater value by another manufacturer if not replaced in-kind. The contractor is responsible for all labor, material, equipment, and any required items not specifically enumerated but necessary to provide fully functional operation, including modifications to the roof curb and duct work, roof restoration as needed, supply/return duct work modifications, tying the new RTU #2 into a new I-VU BACnet Building Automation Control System (or similar system), and tying in the recently replaced RTU #3. The existing RTU #2 has a condenser unit on a different rooftop with piping; this project intends to keep the condenser equipment in RTU #2 and provide condenser fan noise attenuation and an acoustic barrier to minimize noise spillage to the north of the Village Hall. All piping and condensers no longer needed should be removed and roofing repaired. The supplied unit must meet all current energy code requirements. The contractor must obtain required permits, perform required tests, use materials and components that comply with current local code requirements, and ensure all work is performed during normal work hours. The contractor is responsible for a clean workspace, disposal of materials per EPA guidelines, and all-inclusive bid pricing including any subcontractors required for the work. Bidders must list all subcontractors on the appropriate bid form and coordinate their work accordingly. Question Deadline 02/11/2026 at 11:00 AM CT Submit by email to: Jbielak@vrf.us

Award

Fire / Police

$168,163.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

March 19, 2026

Project location map

400 Park Ave, River Forest, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.