Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 6, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of a fire / police facility in River Forest, Illinois. Completed plans call for the renovation of a fire / police facility.
As of April 06, 2026,project was awarded to Anchor Mechanical Inc, awarded amount is $168,162.63. The purpose of this project is to replace RTU #2, install an i-VU Building Automation System, acoustic barrier, and related equipment located on the roof of the Village Hall at 400 Park Avenue, River Forest, Illinois. The project includes the replacement of one (1) packaged rooftop unit (RTU) in accordance with manufacturer requirements. The unit being replaced is a Trane 27.5-ton packaged RTU; the new unit should be of equal or greater value by another manufacturer if not replaced in-kind. The contractor is responsible for all labor, material, equipment, and any required items not specifically enumerated but necessary to provide fully functional operation, including modifications to the roof curb and duct work, roof restoration as needed, supply/return duct work modifications, tying the new RTU #2 into a new I-VU BACnet Building Automation Control System (or similar system), and tying in the recently replaced RTU #3. The existing RTU #2 has a condenser unit on a different rooftop with piping; this project intends to keep the condenser equipment in RTU #2 and provide condenser fan noise attenuation and an acoustic barrier to minimize noise spillage to the north of the Village Hall. All piping and condensers no longer needed should be removed and roofing repaired. The supplied unit must meet all current energy code requirements. The contractor must obtain required permits, perform required tests, use materials and components that comply with current local code requirements, and ensure all work is performed during normal work hours. The contractor is responsible for a clean workspace, disposal of materials per EPA guidelines, and all-inclusive bid pricing including any subcontractors required for the work. Bidders must list all subcontractors on the appropriate bid form and coordinate their work accordingly. Question Deadline 02/11/2026 at 11:00 AM CT Submit by email to: Jbielak@vrf.us
Award
Fire / Police
$168,163.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 17, 2026
March 19, 2026
400 Park Ave, River Forest, IL
Related To This Project
River Forest, IL
Bid Date: Feb 11 2026
River Forest, IL
Bid Date: Feb 25 2026
River Forest, IL
Bid Date: Apr 03 2026
River Forest, IL
Bid Date: May 07 2026
River Forest, IL
Bid Date: Apr 08 2026
River Forest, IL
Bid Date: May 13 2026
River Forest, IL
Bid Date: May 28 2026
River Forest, IL
Bid Date: Jun 05 2026
River Forest, IL
Bid Date: Jan 21 2026
River Forest, IL
Bid Date: Feb 22 2026
River Forest, IL
Bid Date: Feb 22 2026
River Forest, IL
Bid Date: Jan 21 2026
River Forest, IL
Bid Date: Dec 19 2025
River Forest, IL
Bid Date: Dec 05 2025
River Forest, IL
Bid Date: Dec 04 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
