BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 10, 2026 at 7:00 PM

Updated February 13, 2026

Site work for a water / sewer project in Madison, Wisconsin. Completed plans call for site work for a water / sewer project.

Prequalification applications must be completed and submitted to the District office no later than 5:00 p.m., Friday, January 23, 2026. Bidders will be notified only of disqualification no later than Tuesday, January 27, 2026. Question Deadline 02/05/2026 All questions regarding the project shall be directed to John Bembinster, Project Manager, Madison Metropolitan Sewerage District, johnb@madsewer.org. All questions about the meaning or intent of the Contract Documents shall be submitted to the District in writing not less than seven (7) days prior to the date for opening of Bids. The work consists of furnishing all labor, materials, supplies, equipment, and other incidentals necessary to complete the contract for the Pumping Station Bar Screens project. The project includes the installation of new traveling rake screens in one channel at Pumping Stations 2, 7, 8, and 11. It also includes the installation of new screenings compactors; new electrical and controls; heating and ventilation improvements; structural modifications; and new odor control at Pumping Station 7. All other items shown on the drawings and included in the specifications are part of the scope. The contractor must provide all items, articles, materials, operations, or methods mentioned or scheduled on the drawings or in the specifications, including all labor, supervision, equipment, incidentals, and permits necessary to complete the work as described. Any part of the work reasonably implied or normally required to make each installation satisfactorily operable must be performed and included in the applicable prices bid. The intention is to provide complete operable systems, subsystems, and other items of work, with all incidental items considered included even if not specifically called out in the specifications. Pump Station 2, 833 W Washington Ave, Madison, Dane County, Wisconsin (43.0633164,-89.40018). Pump Station 7, 6300 Inland Way, Monona, Dane County, Wisconsin (43.0483503,-89.3376608). Pump Station 8, 901 Plaenert Dr, Madison, Dane County, Wisconsin (43.049321,-89.399775). Pump Station 11, 4760 East Clayton Rd, Blooming Grove, Dane County, Wisconsin (43.0224372,-89.3667635). Instructions to bidders include registering and downloading bidding documents via QuestCDN, submitting bids electronically via the same platform, and including a bid security equal to at least 5% of the bid amount. Prime contractors must register as planholders, and subcontractors are also recommended to do so. A performance bond and payment bond, each equal to the contract price, are required from the awarded bidder. The District reserves the right to reject any or all proposals or to waive any technicality. Bidders must not discriminate in employment and are encouraged to ensure equal employment opportunities. Prequalification is required for all bidders. All questions regarding the project should be directed to the designated Project Manager.

Post-Bid

Water / Sewer

$5,000,000.00

Public - City

Site Work

104

30

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
400
Active Projects
232
Bidding Soon
1,806
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2026

April 13, 2026

Project location map

Multiple Locations, Madison, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.