Site work for a road / highway in Montclair, California. Completed plans call for site work for a road / highway.
License Requirements Class A or C-10 Monte Vista Water District (District) is soliciting bids from qualified contractors to provide construction services for the Underground Powerline Project (Project). The scope of work involves relocating existing aerial power and communication lines to underground service at Monte Vista Water District's Plant 1, requiring full coordination with Southern California Edison (SCE) and Frontier Communications. The contractor will perform site verification, removal of existing equipment, trenching and conduit installation, vault construction, and installation of new transformers, switchboards, disconnect switches, and associated electrical components per utility specifications. Work includes coordinating inspections, approvals, cable pulling, and energization with the utilities. Question Deadline 02/04/2026 at 5:00 PM PT All questions or requests for interpretation regarding this bid solicitation must be submitted online Work may include but not be limited to the following: furnish all labor, materials and equipment to relocating existing aerial power and communication lines to underground service. Relocate Existing Aerial Power and Communication Lines to Underground Installation and Demolish Associated Materials at Monte Vista Water District. Refeed Existing Impacted Building From New Service Switchboard. All Equipment and Materials Shall Be Installed By the Responsible Parties as Designated, Including but Not Limited to the Transformer, Switchboard, Disconnect Switch, Conduits, And Cables. Scope of Work Includes: 1. Install Approx. 310ft High Voltage Conduit Trench. 2. Install Approx. 285ft Communication Conduit Trench. 3. Install (1) Utility Transformer Pad and (1) 400a, 120/208v, 3ph Switchboard. 4. Install (2) 25kva, 208v-120/240v Transformers. 5. Install (1) 600v, 150a Disconnect Switch. 6. Install Approx. 330ft Conduit Trench With 2" Pvc Conduit From New Switchboard 'ms' to Impacted Buildings. 7. Install Associated Circuit Breakers, Pullboxes, Communications Vault and Cables.
GC Bidding
Roads / Highways
$800,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 12, 2026
March 2, 2026
10575 Central Ave, Montclair, CA
Related To This Project
Montclair, CA
Bid Date: Dec 23 2025
Montclair, CA
--
Montclair, CA
Bid Date: Jun 13 2025
Montclair, CA
Bid Date: Jul 08 2025
Montclair, CA
Bid Date: May 13 2025
Montclair, CA
Bid Date: May 13 2025
Montclair, CA
Bid Date: Apr 17 2025
Montclair, CA
Bid Date: Apr 16 2025
Montclair, CA
Bid Date: Mar 31 2025
Montclair, CA
Bid Date: Jan 16 2025
Montclair, CA
Bid Date: Jan 06 2025
Montclair, CA
Bid Date: May 07 2019
Montclair, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.