Site work for a pipeline in Chillicothe, Missouri. Completed plans call for site work for a pipeline.

The work consists of furnishing all labor, materials, equipment, tools, and supervision to complete incidental and miscellaneous items associated with related work as shown on the plans, but not specifically identified in the bid schedule. This includes installation of a new HDPE generator fuel line, connecting to an existing fuel tank, connecting to a forwarding skid, grading, vegetative restoration, and any other miscellaneous and incidental items that may be shown on the drawings or required for complete installation. The project location is in the City of Chillicothe, Missouri, Livingston County, specifically at the Chillicothe Municipal Utilities Substation. The work also includes construction of fill, compaction, pavement removal and installation, curb and gutter installation, repair and installation, erosion control, material sampling and testing, certifications, adjustment of existing structures, coordination with jurisdictional agencies, and responsibility for construction standards, traffic control, and safety requirements. Permits must be secured from the respective authorities, and all necessary regulatory requirements must be met. The contractor is also responsible for locating and repairing any existing underground utilities damaged during the work and for providing the necessary surveying and construction staking. The work to be performed generally consists of the installation of an HDPE fuel line, connection to the forwarding skid, and connecting to the fuel tank. Bidders with questions concerning this Invitation may contact Michael Atkinson, P.E., Allgeier, Martin and Associates, Inc., 7231 East 24 th Street, Joplin, Missouri 64804, 417-680-7200 2. LOCATION 2.1 In the City of Chillicothe, Missouri, Livingston County as shown on the drawings. 2.2 Chillicothe Municipal Utilities Substation.

Post-Bid

Pipeline

$300,000.00

Public - City

Site Work

5

10

7

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2026

March 13, 2026

Project location map

To Be Determined, Chillicothe, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed