BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2026 at 7:00 PM

Updated March 21, 2026

Site work, new construction and renovation of a mixed-use development in Asheville, North Carolina. Completed plans call for the construction of a municipal facility; for site work for a municipal facility; and for the renovation of a parking garage.

For furnishing labor, materials, equipment and tools for the Asheville Municipal Building. Project consists of the demolition and replacement of an elevated apparatus bay slab. Offices and rooms located below the slab will be demolished to facilitate the slab replacement. The reconstruction of these spaces is included in project scope. A portion of the building will remain occupied; occupant located within construction area will need a new office built out prior to start of slab demolition. This build out is included in project scope. Principal trade contractors are solicited for the following packages: bp0100 general trades | $200k bp0240 demo & abatement | $500k bp0300 concrete | $450k bp0400 masonry | $300k bp0500 structural steel & misc. Metals | $1m bp0622 millwork | $35k bp0781 fireproofing | $30k bp0810 doors, frames & hw | $49k bp0880 glass & glazing | $13k bp0925 drywall & act | $200k bp0960 flooring | $125k bp0966 epoxy flooring | $60k bp0990 painting | $42k bp1000 accessories | $18k bp1014 signage | 5k bp1236 instutional casework | $40k bp2100 fire protection | $88k bp2200 plumbing | $450k bp2300 hvac | $800k bp2600 electrical | $950k additional packages may be added and deleted by the owner and construction manager. Blum Construction has a long-standing commitment to maximize minority and other HUB participation on all our projects, and we recognize the importance the City of Asheville places on minority and HUB participation. There is an established 8.38% Black and Hispanic MWBE participation goal on this project. Historically underutilized and minority business participation is strongly encouraged. If MWBE subcontractors require assistance with bonding or payment terms, please let us know. Blum Construction has the ability to create custom solutions to support a successful project outcome. Examples of Trade Partner Support include quick pay arrangements, modified insurance limits, bonding access or alternative bonding solutions, joint check agreements, prequalification assistance, disaggregation of bid packages, alternate options for financial statements prequalification requirements, break out of materials and equipment to support cash flow. For any questions, please contact Lauren Ashley (lauren.ashley@flblum.com). Completed prequalification forms should be submitted to Lauren by March 20, 2026.

Post-Bid

Municipal

$5,900,000.00

Public - City

New Construction, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
1
Bidding Soon
750
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2026

May 18, 2026

Project location map

100 Court Plaza, Asheville, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.