BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2026 at 7:00 PM

Updated March 6, 2026

Site work and new construction of a clubhouse / community center in Moody, Alabama. Completed plans call for the construction of a 89-seat clubhouse / community center.

https://www.trussvilletribune.com/2026/02/10/moody-council-approves-funds-for-new-storm-shelter/ Moody Council approves funds for new storm shelter February 10, 2026No comments By Nathan Prewett, For the Tribune MOODY, Ala. – If all goes well, Moody will have its third storm shelter at an estimated finish date in mid-April. ________________________________ Furnish all materials, labor, tools, and equipment, and perform the work of constructing a FEMA P-361/ICC-500 compliant storm shelter with a certified 89-person capacity. The shelter is to be above-ground, prefabricated, pre-manufactured from 1/4" steel plate material with a rounded roof, primed and painted tan (white optional). The project includes two handicap accessible, 6-point locking doors; side and center bench seating; LED primary and emergency lighting; electric forced air ventilation with guarded intake and exhaust; a dehumidifier with battery backup; Helical Piers installation; and an ADA compliant chemical toilet. Instructions to bidders: Bids must be made using the forms provided, properly executed with all items filled out. No changes or additions to the Bid Form are allowed. Unauthorized conditions or limitations may result in rejection. Late bids will not be considered and will be returned unopened. Each bid must be in a sealed envelope with the work title, bidder's name and address, and the date and time of bid opening. Only listed items on the bid form and quantities actually used will be paid. A certified check or bid bond of at least 5% of the total bid, not exceeding $10,000, must accompany each proposal. The successful bidder must provide a Performance Bond for 100% of the bid amount and obtain all required licenses and permits. Bidders must provide evidence of proper licensing under Alabama law.

Bid Results

Clubhouse / Community Centers

$164,670.00

Public - City

New Construction, Site Work

6

6

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2026

February 26, 2026

Project location map

1304 Colgate Rd, Moody, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.