BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 18, 2026 at 7:00 PM

Updated February 19, 2026

Addition to a medical facility in Castroville, Texas. Completed plans call for the addition of a 9,000-square-foot, two-story above grade medical facility.

The Medina County Hospital District, Hondo, Texas is seeking sealed bids for the addition of a two-story addition to the Castroville Rural Health Clinic, located at 8406 FM 471, Castroville, Texas, 78009. The addition consists of general construction to add approximately 9000 square feet to the existing Health Clinic. Plans and specifications for the new addition will be available on the Medina Regional Hospital website. The Medina County Hospital District reserves the right to accept or reject any and all bids. For questions about the project please contact Brandon Haby (830)444-5507. A. Work Included: Furnish labor, materials, services, equipment, and appliances required in conjunction with design, fabrication and erection of formwork for cast-in-place concrete complete including but not limited to the following: 1. Wood forms. 2. Permanent metal forms. 3. Cardboard carton forms (void boxes). 4. Shores and reshoring. 5. Installation in formwork of items furnished by other trades. 6. Construction joint bulkheads, keys, blockouts, and sleeves. B. Extent of formwork is indicated by cast-in-place concrete structures shown on Drawings. C. Related Work Specified in Other Sections: 1. Forms for sitework concrete: division 3. 2. Metal floor decking for floor slabs: division 5. A. Work Included: Furnish all labor, materials, services, equipment and appliances required in conjunction with the fabrication, delivery and placement of reinforcement and embedded metal assemblies for cast-in-place concrete, including bars, welded wire fabric, ties and supports. B. Extent of reinforcement and embedded metal assemblies for cast-in-place concrete is shown on Drawings and in schedules. C. Related Work Specified in Other Sections: 1. Testing laboratory services: Section 01 45 29. 2. Reinforcement in conjunction with drilled piers: Section 31 63 29. 3. Reinforcement in conjunction with sitework concrete: Division 3. A. Work Included: Furnish all materials, equipment, transportation and facilities, and perform all labor necessary for the following: 1. Furnishing and placing cast-in-place concrete. 2. Grouting structural steel. 3. Grouting precast concrete connections. 4. Finishing and curing of concrete. 5. Furnish concrete for drilled piers. 6. Concrete mix designs. 7. Expansion joint traffic plate. 8. Vapor retarder. B. Related Work Specified Elsewhere: 1. Paving, curbs, gutters, and sidewalks. 2. Reinforcing steel: Section 03 20 00. 3. Precast Concrete Tilt-up Panels: Section 03 47 13. 4. Concrete formwork: Section 03 10 00. 5. Furnishing and placing post-tensioning tendons: Section 03 38 00. 6. Placing of pier concrete: Section 31 63 29. 7. Laboratory testing and inspection: Section 01 45 29. A. Work Included: Furnish all labor, materials, services, equipment and appliances required in conjunction with or properly incidental to furnishing, fabrication, delivery, and erection of structural steel complete, including, but not limited to, the following: 1. Structural steel columns, girders, beams, angles, rigid frames, trusses, shelf angles, angle frames for openings in floors and roofs, galvanized cooling tower grillage, steel supports for elevator machines, steel hoist beams for elevator equipment, steel supports for elevator guide rails, steel crane rails and stops, steel plates, miscellaneous deck support angles, shop welded shear studs, connections and component parts. 2. Qualification of welders. 3. Shop prime coat of paint and field touch-up painting. 4. Temporary construction bracing. 5. Fabrication/erection inspection and testing. B. Extent of structural steel work is shown on Drawings including schedules, notes and details to show sizes and locations of members, typical connections and types of steel required. C. Include all supplementary parts and members necessary to complete structural steel work, regardless of whether all such parts are definitely shown or specified and furnish all such bolts, gussets, plates, etc., as may be required for proper assembly of all items. Include miscellaneous deck support angles as required for proper support of metal floor deck around columns, gussets, openings, and obstructions. D. Connection Design: 1. All typical beam to column and beam to beam connections are detailed and shown on the Construction Documents. The Contractor is to comply with these details. 2. Where indicated, truss, bracing connections and special or non-typical structural steel beam connections shall be designed by the fabricator, in accordance with criteria on Drawings. Fabricator-designed connections shall be submitted together with complete calculations for review for acceptability by the Architect. E. Substitutions: 1. Proposed substitutions of sections or modification of details, and reasons therefor, shall be submitted with shop drawings for review. Submitted substitutions must be clearly identified and noted as such. Approved substitutions, modifications, and necessary changes in related portions of work shall be coordinated by fabricator and shall be accomplished at no additional cost to Owner. 2. Substitutions to the beam to column and beam to beam connections shown on the drawings will be reviewed for acceptability if submitted with calculations prepared by a licensed professional engineer. F. Responsibility for Errors: Fabricator shall be responsible for all errors of detailing, fabrications, and for correct fitting of structural steel members. G. Templates: Shall be furnished by fabricator with instructions for setting of anchor bolts and bearing plates. H. Related Work Specified in Other Sections: 1. Testing laboratory services for verification of quality: Section 01 45 29. 2. Embedded metal assemblies: Section 03 20 00. 3. Open web steel joists and joist girders: Section 05 21 00. 4. Metal roof decking: Section 05 31 23. 5. Metal floor decking and shear studs: Section 05 31 13. 6. Cold-formed metal framing: Section 05 40 00. 7. Metal fabrications: Section 05 50 00. 8. Metal stairs: Section 05 51 00. 9. Applied fireproofing: Section 07 81 00. 10. Painting: Section 09 90 00. A. Work Included: Furnish all labor, materials, services, equipment and appliances required in conjunction with or properly incidental to furnishing, fabrication, delivery, and installation of metal floor decking and field welded shear studs complete, including but not limited to the following: 1. Metal floor deck installed. 2. Field welded shear studs installed. 3. Sheet metal flashing around columns. 4. Sheet metal end closures. 5. Inserts to attach ceiling hangers. 6. Cleaning top flange of all supporting steel beams. 7. Sheet metal edge forms. B. Related Work Specified Elsewhere: 1. Structural steel: Section 05 12 00. 2. Miscellaneous metal: Section 05 50 00. 3. Metal roof deck: Section 05 31 23. 4. Laboratory testing and inspection: Section 01 45 29. A. Work Included: Furnish all materials, supplies, equipment, tools, transportation and facilities, and perform all labor and services required in connection with or incidental to steel roof decking, as described in this Section of Specifications, shown on Drawings, or reasonably implied therefrom. Include all reinforcing plates, sump pans, edge closures, pour stops, and related accessories. B. Related Work Specified Elsewhere: 1. Open web steel joists: Section 05 21 00. 2. Structural steel: Section 05 12 00. 3. Miscellaneous metals: Section 05 50 00. 4. Laboratory inspection: Section 01 45 29. A. Work under this section comprises of furnishing hardware specified herein and noted on drawings for a complete and operational system, including any electrified hardware components, systems, controls and hardware for aluminum entrance doors. Any door shown on the drawing and not specifically referenced in the hardware sets shall be provided with identical hardware as specified on other similar openings and shall be included in the General Contractor's base bid. All fire rated door shall be provided with fire rated hardware as required by local code Authority as part of the General Contractor's base bid. The hardware supplier shall verify all cylinder types specified for locking devices supplied as part of the door system with the door manufacturer and/or door supplies. B. The General Contractor shall notify the Architect in writing of any discrepancies (five (5) days prior to bid date) that could and/or would result in hardware being supplied that is none functional, hardware specified and/or hardware that has not been specified that will result in any code violations and any door that is not covered in this specification. Failure of the General Contractor to address any such issue could be considered acceptance of the hardware specified and any and/or all discrepancies could be corrected at the General Contractor's expense. C. Items include but are not limited to the following: 1. Hinges - Pivots 2. Flush Bolts 3. Exit Devices 4. Locksets and Cylinders 5. Push Plates - Pulls 6. Coordinators 7. Closers 8. Kick, Mop and Protection Plates 9. Stops, Wall Bumpers, Overhead Controls 10. Electrified Hold Open Devices 11. Thresholds, Seals and Door Bottoms 12. Silencers 13. Miscellaneous Trim and Accessories A. Scope: This section defines the minimum requirements necessary to render HVAC components clean, and to verify the cleanliness through inspection and/or testing in accordance with items specified herein and applicable NADCA Standards. 1. The Contractor shall be responsible for the removal of visible surface contaminants and deposits from within the HVAC system in strict accordance with these specifications. 2. Existing Duct Systems: All existing supply air, return air, outside air, general exhaust and kitchen exhaust air duct systems indicated on the plans to remain shall be cleaned. In addition, after cleaning, existing duct systems having internal duct liner insulation shall be sealed with Foster 40-30 fungicidal protective coating or approved equal. Apply sealant per manufacturer's recommendations. 3. The HVAC system includes any interior surface of the facility's air distribution system.

Post-Bid

Medical

$8,000,000.00

Public - County

Addition

125

24

14

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

April 2, 2026

Project location map

8406 FM471, Castroville, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.