BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 16, 2026 at 7:00 PM

Updated January 17, 2026

This is a service / maintenance or supply contract in Glendale, California. Contact the soliciting agency for additional information.

The Scope of Work includes, but is not limited to: 1. Project management, planning, and coordination 2. Data analysis, data cleanup, and migration to the UN model 3. Electric GIS data will use the Schneider Electric ArcFM XI asset package and solution, and Fiber GIS data will be migrated into Schneider Electric Fiber Manager XI solution. Water GIS data will use the standard ESRI asset package without third-party solutions 4. Development of Electric, Fiber, and Water UN models, including configuration of assets, data schema, rules, tiers, subnetworks, associations, etc. 5. Configuration of UN functionality such as electric feeder tracing, fiber tracing, water valve isolation and water pressure zone tracing 6. Maintaining current integrations with the City's electric GIS to DataVoice International OMS, DNV Synergi, ACS SCADA, ETAP 7. Setup of maps and map services to support the ArcGIS UN deployment 8. Enterprise system design, testing, validation, and deployment of the ESRI UN for electric, water and fiber 9. Training for City staff on the UN model, ArcGIS Pro, and related workflows 10. Development of as-built documentation and system administration manuals 11. Warranty, support, and post-implementation services Any questions related to the proposal are to be directed to the Project Manager whose name appears below: Hovig Tchagaspanian GIS Manager - City of Glendale GIS@Glendaleca.gov In the absence of the Project Manager, the Project Managers supervisor, Tao Li, may respond to vendor inquiries or manage communications related to this RFP. Currently, the City of Glendale manages its Electric, Fiber, and Water utility GIS datasets and related operations through legacy ArcMap-based processes and older geometric network models. These systems, while functional, are not aligned with ESRI's current technology roadmap centered on ArcGIS Pro and the ArcGIS UN for network management. The City intends to implement the ESRI UN to modernize its Electric, Fiber, and Water GIS environments. The solution will enhance UN modeling, tracing, system integration, data management, and field mobility. Key components of the sought-after solution include: an upgraded GIS environment based on ArcGIS Pro and ArcGIS Enterprise; fully configured UN models for Electric, Fiber, and Water; advanced network tracing and analytics (e.g., electric feeder tracing, water valve isolation); automated data workflows; mobile GIS solutions; and integration with existing electric enterprise systems. The City reserves the right, at its sole discretion, to reject any and all proposals or to cancel this RFP in its entirety. Deadline for submitting vendor questions on content of RFP February 2, 2026

Sub-Bidding

Municipal

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
604
Active Projects
320
Bidding Soon
3,253
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2026

March 30, 2026

Project location map

Multiple Locations, Glendale, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.