BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 10, 2026 at 8:00 PM

Updated March 11, 2026

Renovation and addition to an educational facility in Cameron, Missouri. Working plans call for the addition of a educational facility; and educational facility.

**As of March 10th, 2026, bids were cancelled. No definite date for rebid** Sealed bids are requested for an addition and renovation at Cameron High School located at 1220 South Park, Cameron, MO. Bids must be submitted at the District Office at 423 N. Chestnut Street and will be publicly opened and read. Plans and specifications can be purchased at Drexel Technologies, 10840 West 86th Street, Lenexa, KS, or accessed digitally. A 5% bid bond, based on the bid amount and payable to Cameron R-1 School District, is required. The project is subject to Missouri Prevailing Wage Rate Requirements. The right is reserved to accept or reject any or all bids. The institution is an Equal Employment and Educational Opportunity Institution. A. This DIVISION requires the furnishing and installing of complete functioning Sprinkler systems, and each element thereof, as specified or indicated on Drawings or reasonably inferred, including every article, device or accessory reasonably necessary to facilitate each system's functioning as indicated by the design and the equipment specified. Elements of the Work include materials, labor, supervision, supplies, equipment, transportation, and utilities. B. In case of an inconsistency between the Drawings and Specifications or within either document, the better quality or the greater quantity of work shall be provided in accordance with the Architect or Engineer's interpretation. C. Refer to Architectural, Structural, Mechanical, Electrical and Plumbing Drawings and all other contract documents and to relevant equipment drawings and shop drawings to determine the extent of clear spaces and make all offsets required to clear equipment, beams and other structural members to facilitate concealing piping in the manner anticipated in the design. A. The Contractor shall procure the services of an independent air balance and testing contractor, approved by the A/E, which specializes in the balancing and testing of heating, ventilating and air conditioning systems, to balance, adjust, and test air moving equipment and air distribution and exhaust systems and all water flow circuits. All work by this contractor shall be done under engineer employed by them. All instruments used by this contractor shall be accurately calibrated and maintained in good working order. If requested the tests shall be conducted in the presence of the A/E responsible for the project and/or his representative. The testing and balancing contractor shall be certified by NEBB or AABC and all work shall be performed in accordance with these organizations' published procedure manuals. B. The balancing contractor shall prepare a certified report of all tests performed. The report shall be written on standard forms prepared by NEBB or AABC or facsimiles thereof. The balancing contractor shall submit 3 copies of this report to the Mechanical Contractor who shall submit them to the A/E for review and distribution. C. Air balance and testing shall not begin until systems have been completed and are in full working order. All heating, ventilation, and air conditioning systems and equipment shall be in full operation during each working day of testing and balancing.

Final Planning

Educational

$8,450,000.00

Public - City

Addition, Renovation

107

36

38

5

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2026

September 10, 2026

Project location map

1022 S Chestnut St, Cameron, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.