Published January 27, 2026 at 7:00 PM

Updated January 28, 2026

Site work for a water / sewer project in Ridgefield, Connecticut. Completed plans call for site work for a water / sewer project.

The project involves connecting Ridgefield High School and Middle School campus to the Aquarion Water Company's Ridgefield Main System. This interconnection will require the installation of a new water main beginning at the intersection of Craigmoor Road and extending along North Salem Road to the school campus. On the campus property, a meter pit will be installed and connected to the existing campus water system. Additionally, the project includes installation of a new fill line for the fire pump house water storage tank and related infrastructure improvements. Bidders are expected to comply with funding and regulation requirements, and the Town of Ridgefield reserves the right to waive any informality or to reject any or all bids. All questions or requests for information shall be submitted to David McFate, Purchasing and Finance Manager, at purchasing@ridgefieldct.gov. Deadline for Questions/RFI shall be February 3, 2026, 4:00PM. A. This Project involves CT Drinking Water State Revolving Fund (DWSRF) funding and is subject to the additional requirements set forth in this document and in the following attachments: 1. Attachment A - DAS Update Statement 2. Attachment B - Executive Order No. 3 3. Attachment C - Executive Order No. 17 4. Attachment D - Executive Order No. 16 5. Attachment E - Executive Order 12549 6. Attachment F - Clean Water Memorandum and Subcontractor Verification Form 7. Attachment G - State Prevailing Wage Documents 8. Attachment H - Federal Prevailing Wage Documents 9. Attachment I - AIS Guidance Document 10. Attachment J - De Minimis Final Utilization, Certification and Tracking Forms (OMITTED) 11. Attachment K - Interim Guidance for MBE and WBE's Requirements 12. Attachment L - Required Connecticut General Statutes (Section 4a - 60) 13. Attachment M - Executive Order 11246 (DELETED) 14. Attachment N - Federal Regulation 2 CFR 200.216 15. Attachment O - Project Signage Requirements 16. Attachment P - CERT-141 Template 17. Attachment Q - (DELETED) 18. Attachment R - Build America, Buy America Memorandum - Act Implementation Procedures for EPA Office of Water Federal Financial Assistance Programs 19. Attachment S - Clean Air Act 20. Attachment T - Executive Order 11738 21. Attachment U - Age Discrimination Act of 1975 22. Attachment V - Title VI of the Civil Rights Act of 1964 23. Attachment W - Federal Water Pollution Control Act Amendments of 1972 24. Attachment X - Rehabilitation Act of 1973 25. Attachment Y - Executive Order 11914 26. Attachment Z - Executive Order 12250 A. This Project involves CT Drinking Water State Revolving Fund (DWSRF) funding and is subject to the additional requirements set forth in this document and in the following attachments: 1. Attachment A - DAS Update Statement 2. Attachment B - Executive Order No. 3 3. Attachment C - Executive Order No. 17 4. Attachment D - Executive Order No. 16 5. Attachment E - Executive Order 12549 6. Attachment F - Clean Water Memorandum and Subcontractor Verification Form 7. Attachment G - State Prevailing Wage Documents 8. Attachment H - Federal Prevailing Wage Documents 9. Attachment I - AIS Guidance Document 10. Attachment J - De Minimis Final Utilization, Certification and Tracking Forms (OMITTED) 11. Attachment K - Interim Guidance for MBE and WBE's Requirements 12. Attachment L - Required Connecticut General Statutes (Section 4a - 60) 13. Attachment M - Executive Order 11246 (DELETED) 14. Attachment N - Federal Regulation 2 CFR 200.216 15. Attachment O - Project Signage Requirements 16. Attachment P - CERT-141 Template 17. Attachment Q - (DELETED) 18. Attachment R - Build America, Buy America Memorandum - Act Implementation Procedures for EPA Office of Water Federal Financial Assistance Programs 19. Attachment S - Clean Air Act 20. Attachment T - Executive Order 11738 21. Attachment U - Age Discrimination Act of 1975 22. Attachment V - Title VI of the Civil Rights Act of 1964 23. Attachment W - Federal Water Pollution Control Act Amendments of 1972 24. Attachment X - Rehabilitation Act of 1973 25. Attachment Y - Executive Order 11914 26. Attachment Z - Executive Order 12250 A. The work of this section consists of special project procedures during construction including: 1. Contract and Specification Revisions for 2025 2. Construction Sequence 3. Site Specific Safety Plan 4. Contractor's Emergency Service 5. Schedules 6. Cash Flow Projection And Schedule 7. Road Opening Permits 8. Separation of Water Lines from Sewers 9. Pipe Locations 10. Layout of Water Main and Appurtenances 11. Fire Service Connections 12. Protection of Underground Facilities and Damages Thereto 13. Disposal of Excavated Pipe and Construction Debris 14. Groundwater Conditions 15. Pavement Schedule 16. Traffic Control 17. Contractor Furnished Materials 18. Pre-Construction and Post-Construction Videos

Sub-Bidding

Water / Sewer

$500,000.00

Public - City

Site Work

15

31

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,073
Active Projects
541
Bidding Soon
6,076
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.