Published April 8, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a power facility in White Rock, New Mexico. Conceptual plans call for site work for a power facility.

As of April 08, 2026, the project is canceled. Project is no longer needed.** Foundation Piers for White Rock Substation Questions Due Date: Feb 12th 2026, 2:00 PM MST Questions must be submitted through the County's Procurement Portal. Any questions must be received in writing at least five (5) business days prior to the submission due date, unless otherwise stated herein or in an addendum. The summary of work is as follows, but is not limited to the following: A total of five (5) piers needed at the White Rock Substation. All piers will require a caisson to be used due to very loose soil. All piers can be safely drilled without risk of overhead energized conductors. A utility employee will be required to be on-site during all work to ensure clearance from energized equipment. Pier 1 will be a 36" diameter pier a depth of 10 feet. Piers 2, 3, 4, & 5 will be drilled at a depth of 21 feet below a pit that will be 48" below the existing surface. These piers will be a diameter of 48" and approximately 10 feet apart. The logistics of access will require Pier 1 to be drilled first. At the completion of Pier 1, the drilling rig must be moved so that the containment pit can be dug for drilling Piers 2-5. Los Alamos County is receptive to suggestions to improve the logistics of the work. Additional documentation can be accessed through the link below

Project Abandoned

Power Plant

$300,000.00

Public - County

Site Work

22

3

8

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
20
Bidding Soon
216
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2026

April 9, 2026

Project location map

To be determined, White Rock, NM

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.