Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 3, 2026 at 7:00 PM

Updated March 4, 2026

Site work, new construction and renovation of an educational facility in Salt Lake City, Utah. Completed plans call for the construction of a 2,982-square-foot, one-story above grade educational facility; for the renovation of a educational facility; and for site work for a educational facility.

This project is an interior remodel located on level 3 of the Garff Executive Education Building to create a new ION Center (approximately 3,000SF). The scope of work includes enclosing the new suite/center, updating wall layout and door locations within existing spaces, and dividing up the adjacent classroom to create new offices. This scope also includes mechanical, electrical and plumbing revisions to support the new space configuration. The contractor will be required to coordinate with the owner provided furnishings & systems to be installed during the project. This project is surrounded by active classrooms, study rooms, and collaboration spaces, which will require some disruptive activities to be done off-hours. Noisy or disruptive may activities include, but not limited to: demolition, framing, hanging drywall and roto-hammer/drilling. This type of work will need to be coordinated with the project team & facility manager to minimize the impact to occupants. The FLCC includes off-hour work and the complexity of working in an active/occupied facility. Addendum #1-#2 have been issued as of 2-6-2026. Q's deadline: Friday, Jan 30 at 12pm

Post-Bid

Educational

$500,000.00

Public - State/Provincial

New Construction, Renovation, Site Work

34

3

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
64
Bidding Soon
1,351
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2026

March 4, 2026

Project location map

1731 E Campus Center Dr, Salt Lake City, UT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed