Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 16, 2026 at 8:00 PM

Updated July 22, 2026

Site work and paving for a mixed-use development in Appleton, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; and water / sewer project.

UNIT A-26 CONCRETE PAVING 11,700 SY 8" Doweled Concrete Pavement 20,000 SY 7" Plain Concrete Pavement 950 SY 12" Stone Base 500 CY Excavation 32,400 SY Fine Grading 152,000 SF Concrete Sidewalk/Driveway 19,600 SY Terrace Restoration 165 LF 12"- 21" Storm Sewer 22 EA Storm Inlets 8800 LF Pavement Marking 1500 LF Electrical Conduit 91 EA Concrete Bases Pre-Qualification: Yes A Portion of This Project Includes French Road. French Road is a Local Road Improvement Program (Lrip) Project. Project Unit a-26 Concrete Paving 11,700 Sy 8" Doweled Concrete Pavement 20,000 Sy 7" Plain Concrete Pavement 950 Sy 12" Stone Base 500 Cy Excavation 32,400 Sy Fine Grading 152,000 Sf Concrete Sidewalk/ Driveway 19,600 Sy Terrace Restoration 165 Lf 12"- 21" Storm Sewer 22 Ea Storm Inlets 8800 Lf Pavement Marking 1500 Lf Electrical Conduit 91 Ea Concrete Bases 66 Ea Install City Furnis No bid shall be received unless accompanied by a bid bond equal to five percent of the bid, payable to the City as a guarantee that if the bid is accepted, the bidder will execute and file the proper contract and bond within 10 days from the date the lowest responsible bidders bid is accepted. If the bidder fails to file such contract and bond within the time set by the City, the bid bond shall be forfeited to the City as liquidated damages.

Award

Sidewalks / Parking Lot

$6,000,000.00

Public - City

Paving, Site Work

17

6

5

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
41
Bidding Soon
842
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2026

April 3, 2026

Project location map

202 E. Main Street, Appleton, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed