BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2026 at 7:00 PM

Updated January 22, 2026

Site work for a water / sewer project in San Benito, Texas. Conceptual plans call for site work for a water / sewer project.

The scope of work includes maintenance dredging of approximately 450,000 cubic yards from the Brazos Island Harbor (BIH) Entrance and Jetty Channels, with five projected options. Schedule No. 1 consists of hopper dredging the BIH Entrance Channel from station -13+000 to station -6+000 (estimated 125,000 CY) and the BIH Jetty Channel from station -6+000 to 0+000 (estimated 225,000 CY). The primary placement area for dredged material is Near Shore Feeder Berm 1A/1B. Options 1-3 involve sea turtle trawling for 15 days each, with no additional contract time. Option 4 provides for beach placement at two locations on South Padre Island instead of the Near Shore Feeder Berm, adding 14 calendar days to the contract duration if awarded. Option 5 includes an additional 15 days of sea turtle trawling with no added time. All dredging and beach placement activities are subject to environmental windows for swimming and nesting sea turtles. The entire project must be completed within 120 calendar days after the Notice to Proceed, with an additional 14 days if Option 4 is exercised. Location: Brazos Island Harbor, South Padre Island, TX 78597. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Water / Sewer

$10,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2027

Project location map

Multiple Locations, San Benito, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.