BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2026 at 7:00 PM

Updated February 7, 2026

Renovation of a playground / park / athletic field in Elk Grove Village, Illinois. Completed plans call for the renovation of a playground / park / athletic field.

As of February 6, 2026, this project has not yet been awarded. A timeline for award has not yet been established. The Board of Park Commissioners of the Elk Grove Park District, Elk Grove Village, Illinois, is inviting bids for the 2026 Playground Renovation Roosevelt 5-12 for the Elk Grove Park District. All bidders must submit a Bid Bond or Cashier's or Certified Check for 10% of the total contract amount with their bid form. Bids must be submitted in sealed envelopes, plainly marked with "SEALED BID - 2026 Playground Renovation Roosevelt 5-12" and the bidder's company name on the envelope. Bids shall be submitted only on the Bid Form provided, completed in full, and all total prices must include all work as stated in the specifications. All bids submitted will be considered firm for 60 days from the bid opening date. All bidders are required to demonstrate to the satisfaction of the Park District that they are capable of completing the work as required in the specifications. Each bidder shall submit proof of satisfactorily performed similar work within the preceding two years, including the locations and names of responsible individuals in charge of such projects. The general prevailing rate of wages for each craft or type of worker or mechanic needed to execute the contract or perform the work, as determined by the Park District or the Illinois Department of Labor, shall be paid for each craft or worker, including legal holiday and overtime work. It is mandatory upon the Contractor and any subcontractor to pay not less than the specified rates to all laborers, workers, and mechanics employed in the execution of the contract. Certified payroll is required on the project for both general and subcontractors. All interpretations and requests for interpretations of the Bid Documents shall be made in writing no later than Wednesday January 28, 2026 at 1:00 pm. Any addenda shall become part of the Contract Documents. This project includes site preparation, construction fencing, tree protection, site removals, removal of playground equipment, clearing of cast in place concrete foundations and footings, installation of playground on an engineered wood fiber surfacing, concrete paving and restoration of landscape. Playground equipment will be purchased by the owner and delivered to the site by Park District staff.

Bid Results

Playgrounds / Parks / Athletic Fields

$128,190.00

Public - City

Renovation

4

12

2

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
858
Active Projects
567
Bidding Soon
4,080
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2026

June 8, 2026

Project location map

241 Wellington Ave, Elk Grove Village, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.