BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2026 at 7:00 PM

Updated January 28, 2026

Site work and paving for a civil project in Saratoga Springs, Utah. Conceptual plans call for site work for a bridge / tunnel; for paving for a road / highway; and road / highway.

The main elements of the project consist of the following design activities: • Design the roadway widening of Pony Express Parkway, approximately 6,150’ in length. The project begins on Pony Express Parkway near Tallulah Lane and extends east, including a signalized intersection at Saratoga Road on the East Side of the River, a new bridge supporting a 5 lane road over the Jordan River, and ends at the intersection of Saratoga Road where it connects to an existing widening project currently under design by the City. • Design a bridge removal and replacement of the existing Saratoga Springs Road over Jordan River (049062D) following the process and procedures of UDOT and the current Structures Design and Detailing Manual (SDDM), Geotechnical Manual of Instruction (GMOI), Drainage Manual of Instruction (DMOI), and any other standards applicable to UDOT structures design standards. • Design a trail connection for the Lakeshore/Jordan River trail under the new bridge. • Design a removal and/or relocation the pedestrian bridge on the east side of the roadway. • Design the improvements to connect seamlessly to the planned UTA project at the intersection of Pony Express Parkway and Seaside Street (800 East), using UTA final design documents and, when available, record drawings to confirm geometry, elevations, signal interconnect, striping, and ADA and shared use trail connection • Design the improvements to connect seamlessly to the existing Pony Express Widening Project that starts at and includes the Intersection of Saratoga Road (2300 West) using final design documents and, when available, record drawings to confirm geometry, elevations, signal interconnect, striping, and ADA and shared use trail connection • Coordinate utility conflicts with the appropriate entities, such as the City, Eagle Mountain City, Lehi City, and Timpanogos Special Service District (TSSD). • Design for stormwater runoff control and disposal. • Design of lighting consistent with City’s design standards. • For bridges, conduct required geotechnical investigation, analysis, and recommendations following the process and procedures of UDOT and the current GMOI standards. • For bridges, conduct required hydraulic investigation, analysis, and recommendations following the process and procedures of UDOT and the current DMOI standards. Question Deadline 02/12/2026 at 3:00 PM MT Questions will be received at online. The method of Contractor Selection has not been Determined at this time. "Requests for proposals for design services is underway."

Conceptual

Roads / Highways

$15,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
1
Bidding Soon
768
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2027

Project location map

Multiple Locations, Saratoga Springs, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.