Published February 4, 2026 at 7:00 PM

Updated February 5, 2026

Site work and paving for a mixed-use development in Eaton, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000410403 Question Deadline 02/19/2026 at 4:00 PM MT Project Description: This project consists of saw cutting and removing asphalt pavement and concrete sidewalk, preparing, and compacting base, installing concrete ADA ramp with truncated domes, concrete cross pan apron, new asphalt pavement patch and within the area of repair, and other miscellaneous work. Funding is provided through the Community Development Block Grant (CDBG) program. Federal and State Laws govern the wages and working conditions for laborers and mechanics employed under construction contracts funded with State CDBG funds. The conference attendee shall be an agent of the bidder, familiar with and involved in the bidder's work and the bidding process. Firms not recording their presence at the Pre-Bid Conference will not be allowed to submit bids. Buyer Preferences, Guidelines & Requirements General Requirements - Certified Payroll - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Bonds: All bid proposals must be on the form provided and must be accompanied by a certified check or bank draft, payable to the order of the Town of Nunn negotiable U.S. Government bonds (at par value) or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Bid. Checks accompanying bids not accepted will be returned to the bidders. The selected Contractor will be required to furnish a 100% Contract Performance Bond and a 100% Contract Payment Bond to cover the execution of the Work which shall be in conformity with the Form of Bonds contained in the Specifications and for the Contract Amount. Project Time: The Work will be substantially completed within 30 consecutive calendar days after the Notice to Proceed and complete and ready for final payment within 7 consecutive calendar days past substantial completion. All work shall be completed no later than June 30, 2026. No bids shall be withdrawn after opening of the bids without the consent of the Town of Eaton, for a period of sixty (60) days after the scheduled time of opening bids. The Town of Eaton reserves the right to reject any or all bids, to waive any informalities in bids, and to accept the bid that, in the opinion of the Town of Eaton, is in the best interests of the Town of Eaton.

GC Bidding

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

3

18

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
303
Active Projects
141
Bidding Soon
1,240
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2026

April 27, 2026

Project location map

Multiple Locations, Eaton, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.