BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 28, 2026 at 8:00 PM

Updated March 29, 2026

Site work and paving for a civil project in Jacksonville, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; and water / sewer project.

Description: The Improvements under this Contract consist of milling & resurfacing, base work, shoulder treatment, drainage improvements, highway signing, guardrail, bridges, and other incidental construction on SR 202 (Butler Blvd) from Belfort Road to Hodges Blvd in Duval County. Total Roadway Length: 5.712 Miles Contract Days: 390 Total Bridge Length: 0.336 Miles Total Proposal Length: 6.607 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Days Question Deadline 02/18/2026 at 5:00 PM ET, Direct all questions to the Department by posting them to the Department's website. Questions posted to this site before 5:00 P.M. (EST) on the tenth calendar day prior to the bid opening, will be responded to by the Department. For questions posted after this deadline, an answer cannot be assured. FDOT - 007 - Resurfacing - SR 202 (Butler Blvd)

Award

Roads / Highways

$14,200,844.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
57
Bidding Soon
731
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2026

March 9, 2026

Project location map

JTB Boulevard, Jacksonville, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.