Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 30, 2026 at 7:00 PM
Updated February 6, 2026
Site work and paving for a sidewalk / parking lot in Pierre, South Dakota. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The Contract Scope for the Project Generally Consists of: Curb and Gutter Project 2026 Which Includes but is Not Limited to: Bid Schedule "a": Construction of Approximately 919 Lf of R&r C&g; 420 Lf of R&r Pg; 909 Sf of R&r 6" Conc.; 1,159 Sf of R&r 4" Sw(Cr); 200 Sf of R&r 4" Sw(Fw); 407 Sf of R&r 6" Fillet; 88 Sf of R&r 6" V.g.; 10 Ea of Install Hc; 1 Ea of R&r F&g; 2 Ea of Tree Roots; 20 Lf of Saw Cut; 42 Sf of R&r 6" Conc.; and a Bid Schedule "b": Construction of Approximately 3,423 Lf of R&r C&g; 711 Lf of R&r Pg; 4,350 Sf of R&r 6" Conc.; 4,586 Sf of R&r 4" Sw(Cr); 438 Sf of R&r 4" Sw(Fw); 857 Sf of R&r 6" Fillet; 1 Ea of R&r Mb; 42 Ea of Install Hc; 7 Ea of R&r F&g; 12 Ea of Tree Roots; 15 Lf of Saw Cut; 31 Sf of R&r 6" Conc. There Will Not Be a Pre-bid Meeting. It is the Responsibility of the Bidder to Be Familiar With the Site and the Corresponding Site Preparations. Owner Makes No Claims as the Condition of the Site Except as Identified in the Contract Documents. Questions May Be Directed to: Scott Schweitzer, Pe, Staff Engineer Phone #: (605) 773-7407 Scott.schweitzer@ci.pierre.sd.us City of Pierre 2301 Patron Parkway Suite #1 Pierre, Sd, 57501 Requests for Interpretation Shall Be Submitted Per the Instructions to Bidders. This item shall consist of preparatory work and operations, including, but not limited to: the necessary movement of personnel, equipment, and incidentals to the project site for the establishment of offices, buildings, and other facilities necessary for work on the project and for work and operations which must be performed and for cost incurred before starting work on the various contract items. This item shall consist of all items including and incidental to traffic control planning, devices, mobilization, setup, maintenance, moving/relocating, tearing down, labor, equipment, contractor(s) and or subcontractor(s), etc. The contractor shall at all times shall adhere to the MUTCD latest edition AND shall adhere to standard plates as specified in the requirements set out by the SD DOT R-O-W Permit. Includes, but is not limited to, providing all the necessary labor, materials, tools, supplies, supervision, insurance, equipment, scaffolding, hoisting, fees, etc. necessary to provide the above listed scope of work in accordance with the Contract Documents. It is further understood and agreed that this Work Package also includes the furnishing and installation of the below listed items regardless of whether or not they are in the listed specification section(s) or any other specification section(s), or shown on the plans. Drawing and detail references are provided for reference only and are not to be considered as all-inclusive of Contract Documents for the particular items referenced. (Please note: The word "provide" when used herein shall mean furnish and install completely, including all costs for labor, materials, equipment, hoisting, layout, scaffolding, ladders, staging, tools, rigging and any other facilities necessary to complete the work.")
Post-Bid
Sidewalks / Parking Lot
$900,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 5, 2026
March 9, 2026
Multiple Locations, Pierre, SD
Related To This Project
Pierre, SD
Bid Date: Feb 04 2026
Pierre, SD
Bid Date: Feb 26 2026
Pierre, SD
Bid Date: Feb 05 2026
Pierre, SD
Bid Date: Feb 02 2026
Pierre, SD
Bid Date: Jan 29 2026
Pierre, SD
Bid Date: Jan 13 2026
Pierre, SD
Bid Date: Jan 12 2026
Pierre, SD
Bid Date: Jan 27 2026
Pierre, SD
Bid Date: Jun 19 2019
Pierre, SD
--
Pierre, SD
Bid Date: Dec 23 2025
Pierre, SD
Bid Date: Dec 03 2025
Pierre, SD
Bid Date: Dec 15 2025
Pierre, SD
Bid Date: Dec 01 2025
Pierre, SD
Bid Date: Nov 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
