BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 18, 2026 at 8:00 PM

Updated March 19, 2026

Site work, paving and new construction of a mixed-use development in Albuquerque, New Mexico. Design plans call for the construction of a recreation facility; conference / convention center; hospitality development; multi-residential development; office development; for site work for a playground / park / athletic field; retail development; and sidewalk / parking lot.

Plans call to develop the 236-acre EXPO New Mexico/State Fairgrounds site. The master planning process is split across three phases – discovery, visioning and implementation. The district board is currently in the first phase. The master planning team has released three discussion concepts for the fairgrounds’ future design, committing to none of them while development is ongoing. Each concept follows the same general design principles, predominantly varying based on redevelopment potential, amenities and location. Concept 1 would keep the state fair where it is while providing additional space through the 10-acre public park. Additional amenities would include establishing an entertainment district, building a large event venue, a hotel and providing mixed housing. Redevelopment would be limited to 43 acres in the southwest corner. Concept 2 would expand the state fair’s footprint, building a larger entertainment district with a venue, a hotel, mixed-use space and limited housing. The park would still be included, albeit on a slightly smaller scale. Redevelopment potential would be increased to 51 acres, divided between the southwest corner and some space on a corner of Lomas and San Pedro. Concept 3 would completely relocate the state fair, opening a slew of redevelopment opportunities. The district board would use the newly available space to pursue a public-private partnership to create a central campus through adaptive re-use, neighbored by an event space, school and village corridor. The vision maintains a larger 22-acre park space, entertainment district, workforce training space, mixed-use housing, large event venue, hotel and music/performing arts area. A total of 124 acres would be slated for redevelopment. The New Mexico State Board of Finance has approved a $67 million bond for the State Fair District Board. Combined with the additional $22.35 million bond approved for land acquisition in early December, the total bond funding comes to approximately $90 million. As of March 18, the project is in final master plan development and recommendations. Information regarding developer and general contractor has not been disclosed. Construction is anticipated to begin in 2026. The completion timeline has not been released.

Design

Amusement and Recreation

$67,000,000.00

Public - State/Provincial

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
12
Bidding Soon
185
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.