BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2026 at 7:00 PM

Updated January 31, 2026

Site work and paving for a mixed-use development in Lancaster, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project involves planing, resurfacing, widening, vertical and horizontal centerline improvements, addition of a dedicated turn lane, curb replacement, and pedestrian connectivity improvements. The Contractor shall have its work on the Project Substantially Complete, as defined in the General Conditions, by the following dates: Date for Substantial Completion of phase 2: This is considered an interim completion date, the Date for Substantial Completion of Phase 2 of the Project is 8/28/2026. Phase 2 is as described in the construction plans Maintenance of Traffic. Dates for Substantial Completion of phase 2A: These are considered interim completion dates, the Dates for Substantial Completion of Phase 2A of the Project are 7/18/2026, 7/22/2026 and 7/25/2026 as detailed in the construction plans Maintenance of Traffic. Only Bidders pre-qualified with the Ohio Department of Transportation for the Work involved on this project are eligible to bid this Project.

GC Bidding

Roads / Highways

$3,005,633.00

Public - City

Paving, Site Work

74

7

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
132
Bidding Soon
1,605
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2026

April 14, 2026

Project location map

Arbor Valley Dr, Lancaster, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.