Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 26, 2026 at 8:00 PM
Updated March 27, 2026
Site work and new construction of a parking garage in Shelbyville, Michigan. Completed plans call for the construction of a 25,000-square-foot parking garage; and for site work for a parking garage.
**As of March 26, 2025 this project has not yet been awarded. A timeline for award has not yet been established.** New 25,000sf Vehicle Garage with sitework , demolition of existing facility- Pre-Bid Requests for Information shall be submitted via email to Stephanie Maier smaier@hobbsblack.com. ACRC Shelbyville Vehicle Garage must be included as part of the subject line. Last Day for Pre-Bid RFI’s & Intent to Bid form due 2:00 p.m. January 29, 2026 Board Meeting February 18, 2026 The Architect-Engineer reserves the right to issue Addenda at any time prior to the bid opening. All such addenda shall become, upon issuance, an inseparable part of the Contract Documents. Each bidder shall incorporate within his bid proposal all costs for items listed in the Addenda; and shall acknowledge receipt and the identifying number of each Addendum on the Bid Proposal. WORK COVERED BY CONTRACT DOCUMENTS A. The Work of Project is defined by the Contract Documents and generally consists of the following: 1. New construction of a one-story Pre-Engineered Metal Building structure for the Allegan County Road Commission – Shelbyville. The building will include a vehicle garage and office. Additional elements include a small fire pump building, and new siding & roofing to the existing salt barn, and a fueling station. Work includes civil, structural, architectural, mechanical, plumbing, and electrical. The existing garage structure on-site will be demolished and final outstanding site work will commence once the owner has occupied the new building. 2. New Asphalt and landscaping will be throughout the site. 3. Proposed alternates include removal of select clerestory windows, reduction in HMA paving, exclusion of siding and roofing at the existing salt barn, and an alternative frontage fencing. 4. Awarded contractor will coordinate the necessary phasing with Owner immediately after award to minimize facility access disruptions as facility will need to remain accessible and open throughout the project duration. B. Type of Contract. 1. Project will be constructed under a single prime contract.
Bid Results
Parking Garage
$5,948,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 5, 2026
March 23, 2026
2594 12th St, Shelbyville, MI
Related To This Project
Shelbyville, MI
Bid Date: Nov 07 2025
Shelbyville, MI
--
Shelbyville, MI
Bid Date: Aug 02 2024
Shelbyville, MI
Bid Date: Jun 01 2023
Shelbyville, MI
Bid Date: Nov 30 2022
Detroit, MI
Bid Date: Feb 25 2026
Bay City, MI
Bid Date: Feb 11 2026
Bay City, MI
Bid Date: Feb 12 2026
West Branch, MI
Bid Date: Feb 24 2026
Caro, MI
Bid Date: Feb 10 2026
Lansing, MI
--
Oscoda, MI
Bid Date: Mar 10 2026
Selfridge Angb, MI
Bid Date: Feb 13 2026
Flint, MI
Bid Date: Feb 24 2026
Detroit, MI
Bid Date: Feb 27 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
