BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2026 at 7:00 PM

Updated February 7, 2026

Site work and paving for a mixed-use development in Sugar Grove, Illinois. Completed plans call for site work for a road / highway; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Work Shall Consist of Furnishing All Labor, Materials, Equipment, and Other Incidentals Necessary for the Completion of Constructing Medians/islands on Both Il 47 and Park Avenue; Signing Improvements; Sidewalk Ramp Improvements; and All Other Incidental and Collateral Work Necessary to Complete the Project as Shown in the Plans. Major Quantities Include, but Are Not Limited to: 39 Ton of Sub Gran Mat B, 344 Sq Ft of Pc Conc Sidewalk 5 819 Sq Yd of Pavement Rem, 368 Foot of Comb Cc&g Tm6.12 Aep 1,842 Sq Ft of Conc Median Tsb 6.12, 164 Foot of Teles Stl Sin Support Traffic Control & Protection Special, Construction Layout. 428 Sq Yd of Hma Pavt Fd 13o60 Sq Ft of Detectable Warnings, 56 Foot of Comb Cc&g Tb6.24 Aep, 991 Sq Ft Of Conc Median Surf 6, 118 Sq Ft of Sign Panel T1, 12 Cal Mo of Change Message Sn Spl, Detour Signing. Project Location: At the intersection of IL Route 47 and Park Avenue in the Village of Sugar Grove, Kane County, Illinois. Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Signing Improvements; Sidewalk Ramp Improvements *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

Post-Bid

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
731
Active Projects
394
Bidding Soon
3,737
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2026

April 7, 2026

Project location map

IL-47 & E Park Ave, Sugar Grove, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.