BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 10, 2026 at 8:00 PM

Updated March 12, 2026

Site work for a water / sewer project in Boston, Massachusetts. Completed plans call for site work for a water / sewer project.

Repairs to concrete-encased steel beams within three pier vaults, including removal of deteriorated material, surface preparation, installation of new concrete, and restoration of structural integrity. Remediation of sinkholes within the pier deck by excavating unstable areas, backfilling with approved materials, compacting, and restoring the deck surface. Repairs to concrete delamination at the pier underdeck through demolition of loose concrete, cleaning and treating exposed reinforcement, and installing repair mortar or concrete to restore uniform structural surfaces. Repairs to the existing steel barge, including replacement of deteriorated steel components, corrosion treatment, recoating, and structural reinforcement as required. Adjustment and repair of the connection between an aluminum gangway and the concrete deck platform to restore proper alignment, support, and functionality. All work requires coordination to maintain continuous pier operations and manage limited access, winter conditions, and waterfront construction constraints, using appropriate sequencing, quality control, and safety measures. [Sol_140P4326R0001 | PDF] Location: Boston National Historical Park, Charlestown Navy Yard, Pier 1, Boston, Massachusetts. Address: 21 2nd Avenue, Charlestown, MA 02129 The estimated magnitude of the complete requirement is between $1,000,000 and $5,000,000. Period of Performance: 03/16/2026 to 06/12/2026 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 02/20/2026 Pre-proposal questions shall be submitted a minimum of 5 days prior to the due date and time for proposals. Submit questions only through email to both of the following: Contracting Officer, Mari Tolleson, mari_tolleson@nps.gov

Post-Bid

Water / Sewer

$5,000,000.00

Public - Federal

Site Work

19

12

6

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
3
Bidding Soon
2,076
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2026

March 16, 2026

Project location map

47 3rd St, Boston, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.