Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 30, 2026 at 7:00 PM
Updated January 31, 2026
Site work for a residential development in Estero, Florida. Completed plans call for site work for a residential development.
Reference Number 0000410661 Question Deadline 02/05/2026 at 5:00 PM ET Questions are submitted online Yes The services described in this solicitation shall be completed at the locations identified below: 21401 Corkscrew Ranch Road, Estero, FL, 33928 The Housing Department of the Seminole Tribe of Florida is requesting bids from qualified contractors to provide fence installation services needed at Estero, Florida. o Schedules should be submitted with all bids and updated any time there is a change o Contractors are expected to work Monday-Friday, 8:00AM - 5:00PM unless otherwise specified by the TRIBE's Project Manager o No work shall be performed on Tribal events, holidays, and advisory emergencies, unless otherwise determined by the TRIBE. o When installing new drywall in bedroom, living room, etc., backing must be provided for TVs being mounted on the wall o Place a chase and an outlet at the same area where backing is located o Seal all recess lighting, caulk the lights to the ceiling o Caulk around all exterior lights o All exterior light fixtures must be LED o Any penetration that are made through the wall to the exterior must be caulked or sealed o Any new gutters must have leaf guard o Any roof repairs/replacement must follow Miami-Dade standards BATHROOM: o All wood cabinets are required at all times, when like for like is stated if current cabinet is particle board, include in the bid the price to replace with all wood o Due-rock on walls in the shower or tub area o All joints, corners, and around windows must be sealed with red guard o Extend the Dur-rock 2' on all sides beyond the shower or tub o Shower floor mortar bed, no foam or any other products should be used o Minimum 2-4% pre-slope o Liner should be water tested for 24 hours o Minimum 6 inches o All floor tile should be slip/skid resistant o Shower floor tile should be a maximum of 2x2 mesh o Provide backing for all walls inside tub/shower areas between 32" and 38" o Faucets should be Kohler or Delta o From shower diverter to shower head piping must be copper tubing and copper fittings o Secure the diverter and pipe fittings securely o When tiling the walls extend 2 feet passed the shower or tub o ADA bathroom the entire bathroom must be tile a minimum of 4 feet o All toilets must be Kohler highline o All exhaust must be vented through the roof or soffit o The exhaust fan and light for the bathroom must be on the same switch o All paint must be high gloss KITCHEN: o All wood cabinets are required at all times, when like for like is stated if current cabinet is particle board, include in the bid the price to replace with all wood o All sinks should be deep double drop in sinks o Faucets should be Delta with a pull out spray hose o Moisture resistant (purple) drywall o Cabinet screws should be a minimum of 2 1/2 inches o Efforts should be made to find a stud o If drywall is removed from floor to ceiling, blocking must be provided for upper and lower cabinets o All microwave and kitchen hoods must be exhausted outside MECHANICAL/HVAC: o All AC units must be installed on a metal stand with a secondary pan and connect float switch o A primary float switch must be installed and connected o When replacing duct work all joints and seams must be taped and mastic o All new HVAC units must be a minimum of 16 seer o All flexible ducts mut be a minimum of R8 R-value o All disconnects should be the pull type non-fuse o Rheem, Goodman, Night and Day units preferred o Caulk around all AC vents o Keyed lockout caps must be on all units WATER HEATERS: o GE brand, replaced like for like gallon size o Drain pan required o TRV piped to the outside o All water heaters should have a separate shut off switch o New code required Energy conservation code chapter 4 o Heat traps are mandatory ENCE INSTALLATION: o Supply and install fencing as described below: o Dimensions:4'0" Height on all fencing o Material: Pressure Treated, 2x6 and 4x4 o Color: Natural o Hog wire: installed on the inside, attached to wood fencing, and buried to secure pets from escaping.
Sub-Bidding
Residential Subdivision
$100,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 12, 2026
March 16, 2026
21401 Corkscrew Ranch Road, Estero, FL
Related To This Project
Estero, FL
Bid Date: Feb 18 2026
Estero, FL
Bid Date: Feb 18 2026
Estero, FL
Bid Date: Feb 18 2026
Estero, FL
Bid Date: Jan 02 2026
Estero, FL
Bid Date: Jan 09 2026
Estero, FL
Bid Date: Jan 14 2026
Estero, FL
Bid Date: Dec 15 2025
Estero, FL
Bid Date: Feb 17 2026
Estero, FL
Bid Date: Oct 21 2025
Estero, FL
Bid Date: Oct 20 2025
Estero, FL
Bid Date: Oct 17 2025
Estero, FL
Bid Date: Nov 17 2025
Estero, FL
Bid Date: Oct 06 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
