BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2026 at 7:00 PM

Updated February 4, 2026

Site work and new construction of an educational facility in Madison, Wisconsin. Completed plans call for the construction of a 150,816-square-foot, two-story above grade educational facility; and for site work for a educational facility.

New 150,816 SF, two story Middle School that consists of a series of academic houses of a six section Sixth thru Eighth Grade/ 4k through Elementary classroom spaces, as well as a competition gymnasium with 500 seats and performance, practice gym, cafeteria with cooking kitchen, library, toilets, administrative offices and mechanical rooms. The project also involves site design, to create a new parking area with new entrances, sidewalks and the addition of two age-appropriate playground areas. The building will be heated and cooled by a central heating and cooling plant (fed by a pump and reinject geothermal well field) with individual fan coil units at the rooms. The entire building will be sprinkled. The major materials on the project will include masonry block, utility brick, aluminum sills, stone panel systems and aluminum curtain wall system and storefront window system. TOTAL Gross Building Area: 165,722 SF Building 1 Actual SF: First Floor = 40,516 SF; Second Floor = 30,575 SF; Building 2 Actual SF: First Floor = 45,838; Second Floor = 48,793 SF; Building Height: Gymnasium = 22'-8", Academic areas = 28'-8" Start Date 02/23/2026 Finish Date 07/15/2027 Question Deadline 02/06/2026 All questions regarding these plans andspecifications should be directed to: Susan Bowersox, AIA Project Managers bowersox@opnarchitects.com 319-551-9723 Question Deadline 02/06/2026 Suppliers requiring clarification or interpretation of the Contract / Bidding Documents shall make a written request to the Architect through J.H. Findorff & Son Inc. within 7 (seven) working days prior to bid date.

GC Bidding

Educational

$74,000,000.00

Public - City

New Construction, Site Work

404

30

25

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
415
Active Projects
208
Bidding Soon
1,778
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

February 23, 2026

Project location map

Multiple Locations, Madison, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.