BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2026 at 7:00 PM

Updated January 31, 2026

Site work and new construction of a bridge / tunnel in Kelowna, British Columbia. Completed plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

Through this Request for Proposals (“RFP”), the Regional District of Central Okanagan (the “District”) invites Proposals from organizations experienced in the design and construction of pedestrian bridges, for a project to design and construct the new Gerstmar Bridge across Mission Creek in Kelowna, BC. Full details of the Design Services and Work required is provided in Division 01 of this RFP. Key summary details for this RFP are as follows: Maximum Budget: the District has a maximum budget of $550,000 (excluding GST) available for all Design Services and Work identified herein. Progressive Design-Build Approach: the Services and Work will be performed, by the ‘Design-Builder that is selected from this RFP, in 2-phases using the ‘Progressive Design-Build’ approach. PHASE 1 – Preliminary Design & Detailed Design: Review of Reference Documents Site Survey & Bridge Alignment Confirmation Geotechnical Design & Engineering Preliminary Design Confirm All Regulatory Requirements Class C Cost Estimate for Work Detailed Design & Engineering Class A Cost Estimate for Work Final Owner’s Statement of Requirements Base Services Fixed Fee Consulting Services Agreement Phase to be complete by May 15, 2026 PHASE 2 – Construction Documents & Construction Create Construction Drawings & Specifications Construction Work Optional Services & Work* Stipulated Contract Price (to be mutually agreed at conclusion of Phase 1, and based on sum of: a) Fixed Fee for Construction Documents, b) Estimated Cost of the Work, c) Design-Builder’s % Markup Fee of the Cost of the Work). CCDC14-2013 Design-Build Contract (as modified by Supplementary Conditions) Construction Documents to be completed during the period June 15 to July 15, 2026 Work that is subject to WSA Section 11 Permit Construction must occur during Fish Timing Window of August 7 to August 23, 2026. Work that is not subject to the WSA Section 11 Permit may be completed outside of that Section 11 Fish Timing Window, with Substantial Performance to be achieved no later than September 25, 2026. * ‘Phase 2 – Construction Documents & Construction’ is to be considered ‘Optional Services & Work’, meaning that this Phase 2 Design Services & Work shall only proceed at the District’s sole option, and subject to District approval of; Phase 1 Design, proposed Phase 2 schedule, and proposed Stipulated Contract Price for Phase 2. Should the parties not be able to mutually agree to Contract terms, including a Stipulated Contract Price for Phase 2, then the District may at its sole option conduct a further procurement process to identify and contract with other parties to perform Phase 2. Question Deadline 02/13/2026 at 11:45 AM PT Questions related to this opportunity should be submitted to the Official Contact KAL KAHLON Contact email purchasing@rdco.com . Questions received after this date and time may not be answered. Format yyyy-mm-dd Estimated Contract Duration (in months) 8 Documents can be obtained from https://rdco.bidsandtenders.ca/

GC Bidding

Bridges / Tunnels

$550,000.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
25
Bidding Soon
315
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2026

October 26, 2026

Project location map

To be determined, Kelowna, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.