Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 6, 2026 at 7:00 PM
Updated March 7, 2026
Renovation of a fire / police facility in Miami, Florida. Completed plans call for the renovation of a fire / police facility.
Question Deadline 02/25/2026 All requests for information (RFIs) shall comply with the Cone of Silence, Administrative Order 3-27 and shall be directed in writing to the MDAD project manager with a copy to the Clerk of the Board (clerkbcc@miamidade.gov). The deadline to submit RFIs is no later than five (5) working days before the bid opening date and time specified on the RPQ and Invitation to Bid. Scope of Work shall include, but not be limited to: Provide all labor, equipment and materials at MIA Midfield Fire Station No. 12 to replace existing lockers, repaint and refinish as required existing floor, walls, and ceilings; replace existing ventilation system with proposed fresh air intake and exhaust system and enclosures; install surface mounted LED light fixtures controlled by motion sensors. Double Tier lockers to be floor mounted, per geargrid recommendation. All lockers to include doors. Contractor to provide nameplates. There is a total of 74 lockers. Individual's names will be provided during construction. MDFR Personnel will provide their own locks. The contractor will need to ensure the lockers are made with the ability to be locked. Exposed painted CMU is acceptable. However, Contractor will be responsible to repair & patch CMU encountered upon locker removal. The existing roof warranty has expired. The contractor will have to reroof the area affected with the new work in compliance with applicable building codes and ordinances. The Fire Station will make accommodations for the temporary relocation of the existing lockers upon day of removal. Once the new lockers have been installed the old lockers can be disposed of. Contractor shall review all documents and scope of work provided by Miami-Dade Aviation Department (MDAD) for work to be completed. Please refer to the Plans for further description of the scope of work. **To obtain documents, contractors must sign a Non-Disclosure Agreement (NDA)** Instructions to bidders: All requests for information (RFIs) shall comply with the Cone of Silence, Administrative Order 3-27 and shall be directed in writing to the MDAD project manager with a copy to the Clerk of the Board. The deadline to submit RFIs is no later than five (5) working days before the bid opening date and time specified on the RPQ and Invitation to Bid. Bids for this project must reflect a lump sum amount to be indicated on the MCC-7360 Attachment 5A Bid Form. All quantities provided are estimated and it is the bidder's responsibility to confirm them. Errors, omissions and/or discrepancies in quantities must be brought to the attention of MDAD during the bidding phase. Failure to confirm estimated quantities shall not constitute grounds for subsequent change orders. The lump sum bid amount shall be all inclusive to complete the work scope reflected on the construction bid documents. Bidders are responsible for all costs related to permitting, preparation of required shop drawings, special inspections, preparation of as-built drawings, close-out documentation, and any engineering certificates required.
Post-Bid
Fire / Police
$215,078.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2026
June 15, 2026
4200 NW 22 Street Bldg 3030, Miami, FL
Related To This Project
Miami, FL
Bid Date: Mar 11 2026
Miami, FL
--
Miami, FL
Bid Date: Feb 13 2026
Miami, FL
Bid Date: Mar 03 2026
Miami, FL
Bid Date: Mar 13 2026
Miami, FL
Bid Date: Mar 20 2026
Miami, FL
Bid Date: Mar 06 2026
Miami, FL
Bid Date: Feb 18 2026
Miami, FL
Bid Date: Mar 04 2026
Miami, FL
Bid Date: Jan 29 2026
Miami, FL
Bid Date: Jan 29 2026
Miami, FL
Bid Date: Jan 29 2026
Miami, FL
Bid Date: Jan 29 2026
Miami, FL
Bid Date: Jan 29 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
