Published April 22, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of an educational facility in Lynchburg, Virginia. Completed plans call for the renovation of a educational facility.
Project No. 2025.41 Linkhorne Elementary School The Scope of Work includes the replacement of several adjacent and one nonadjacent section of roof. The roofs include approximately 132 squares of existing TPO at the hexagon section of the building and approximately 201 squares of existing TPO on the other side of the building surrounding the courtyard. The middle section of the building is not included. The existing low-slope roofs are all TPO with structurally sloped roofs. Below the existing TPO are two layers of 2" polyiso insulation over a metal deck. Demolish the existing roof all the way down to the metal deck and replace with two layers of 2" polyiso with a fully adhered TPO roof. Bedford Hills Elementary School The Scope of Work includes the replacement of several adjacent sections of roof. The roofs include approximately 160 squares of existing EPDM at the older west classroom wing, approximately 58 squares of existing EPDM at the cafeteria, and approximately 27 squares of existing EPDM at the southern-most roof below the cafeteria. The sloped roof section of the building is not included, and neither are the 2 auxiliary buildings. The existing low-slope roofs are all EPDM with tapered insulation on metal deck. Demolish the existing roof all the way down to the metal deck and replace the tapered insulation to match what is there now with a fully adhered TPO roof. Perrymont Elementary School: The scope of Work includes the replacement of several adjacent sections of roof. The roofs include approximately 286 squares of existing fully adhered EPDM roof. The steep sloped standing seam metal roofs are not included in this scope. The existing roof is a fully adhered EPDM roof with tapered insulation on a metal deck. Demolish the existing roof all the way down to the metal deck and replace the tapered insulation to match what is there now with a fully adhered TPO roof. Fort Hill Community School: The Scope of Work includes the replacement of several adjacent sections of roof. The roofs include approximately 82 squares of existing EPDM at the 2 main roofs and a total of approximately 7 squares at the 3 accessory roofs. The 2 main existing low-slope roofs are all EPDM with tapered insulation on a lightweight concrete deck. The accessory roof on the plan-east side of the building is structurally sloped with 2 1/2 " of insulation and a 1/2 " coverboard. The accessory roof on the plan-south side of the building is structurally sloped with 3" of insulation and a 3/4 " coverboard. The accessory roof on the plan-north side of the building is tapered insulation on a lightweight concrete deck. For all roofs, demolish the existing roof system all the way down to the deck and replace the insulation to match what is there now with a fully adhered TPO roof. Question Deadline 02/25/2026 at 3:00 PM ET All requests for clarification of or questions regarding this Advertisement for Bids or for additional information must be made in writing to: Will Ruberry, CPPB, Procurement Division by email to william.ruberry@lynchburgva.gov and received by. This project includes roofing repairs and replacement at four Lynchburg City Schools: Linkhorne Elementary School, Bedford Hills Elementary School, Perrymont Elementary School, and Fort Hill Community School. See the project manual for a detailed description of each school.
Award
Educational
$1,215,975.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2026
May 3, 2026
Multiple Locations, Lynchburg, VA
Related To This Project
Lynchburg, VA
Bid Date: Feb 27 2026
Lynchburg, VA
Bid Date: Mar 25 2026
Lynchburg, VA
Bid Date: Mar 25 2026
Lynchburg, VA
Bid Date: Feb 12 2026
Lynchburg, VA
Bid Date: Feb 23 2026
Lynchburg, VA
Bid Date: Mar 18 2026
Lynchburg, VA
--
Lynchburg, VA
Bid Date: Feb 18 2026
Lynchburg, VA
Bid Date: Feb 25 2026
Lynchburg, VA
Bid Date: Feb 26 2026
Lynchburg, VA
Bid Date: Feb 04 2026
Lynchburg, VA
Bid Date: Jan 20 2026
Lynchburg, VA
Bid Date: Jan 15 2026
Lynchburg, VA
Bid Date: Jan 20 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.