Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 17, 2026 at 7:00 PM
Updated February 18, 2026
Site work for a playground / park / athletic field in Plain City, Ohio. Completed plans call for site work for a playground / park / athletic field.
The project will include: demolishing the grandstands, removing lights from lightpoles, removing lightpoles, restoring football goalposts, removing scoreboard, and restoring the site. Items demolished or removed from the site shall be hauled off and disposed of properly. Demolition & Hardscape Removal o Demolish grandstands and sheds ; remove all concrete , haul away debris , and backfill piling holes . Excavate and remove visitor - side concrete footers from old bleachers ; dispose of footers and backfill . Remove and dispose of blacktop from old track and field areas , including high jump and long jump areas . Fence , Gate & Safety Feature Removal . Remove and dispose of the gate and fence at the baseball entrance and walking path ; backfill all holes . Remove and dispose of the fence along the right side of the baseball diamond from the foul pole north . Remove chain -link fencing on the east side of the football field to the softball foul pole ; cut poles flush in blacktop , drive below grade , cold patch holes , and dispose of fencing . o Remove 20 safety rope poles and backfill holes Athletic Equipment & Field Feature Removal Remove and dispose of field goal posts from the practice field . Remove the scoreboard and save for JALSD ; remove associated concrete and backfill holes . Remove lights from poles , salvaging 12 for JA ; disconnect electrical service from the main power source . Remove 9.5 light poles ; grind poles 8 inches below grade , remove grindings , and backfill holes . Site Clearing & Initial Cleanup Remove and dispose of old track equipment , tires , trash , fencing , and unused athletic equipment . o Clear property north and west of the old track to the softball dugout , including removal of dead and hazardous trees to the property line while preserving healthy trees . o Remove and dispose of tires , trash , and old sports equipment north and east of the old track . Site Grading & Surface Preparation Rake the old track and driveway . Prep cleared areas north and east of the old track ; seed and straw disturbed areas . Final Improvements o Sand , prime , and paint field goal posts yellow .
Bid Results
Playgrounds / Parks / Athletic Fields
$108,395.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 13, 2026
March 16, 2026
6440 Killbury-Huber Rd, Plain City, OH
Related To This Project
Plain City, OH
Bid Date: Dec 29 2025
Plain City, OH
--
Plain City, OH
--
Plain City, OH
--
Plain City, OH
--
Plain City, OH
--
Plain City, OH
Bid Date: Sep 09 2025
Plain City, OH
Bid Date: Jun 12 2025
Plain City, OH
Bid Date: Jul 08 2025
Plain City, OH
Bid Date: Jun 02 2025
Plain City, OH
Bid Date: Jun 03 2025
Plain City, OH
--
Plain City, OH
Bid Date: Apr 24 2025
Plain City, OH
--
Plain City, OH
Bid Date: Jan 31 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
