BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2026 at 7:00 PM

Updated March 25, 2026

Site work for a sidewalk / parking lot in Custer, South Dakota. Completed plans call for site work for a sidewalk / parking lot.

Veterans Point Trail is an asphalt trail with metal railing and timber retaining walls that provide access from the parking area to fishing piers and viewpoints at Pactola Reservoir. As the trail switchbacks its way to from the parking area to the shoreline, the contractor should be aware of the steep slopes and limited working area. The asphalt trail is deteriorating, with severe oxidation, cracks, heaving, and undercutting in the asphalt. The retaining walls are leaning and no longer keep material off the Trail. This project will fill and seal the cracks, reconstruction select sections, stabilize eroding areas, and apply a seal coat to the asphalt. Timber retaining walls will be removed and reconstructed with segmental concrete block retaining walls. The pipe railing is damaged in some areas. This project will also repair the damaged sections of railing and eliminate sections where the railing is not needed. The Project will also construct reinforcement with gabion (wire rock baskets) to repair eroded sections at the trails edge and bridge abutments. Existing timber retaining walls will be removed. New larger retaining walls will be constructed. An overlook near water's edge will be eliminated. Tables, benches, and pedestal fire grills will be removed (though new tables and benches are planned for the site as separate work). From the Bridge, a 1,014 ft loop provides access to an inlet. This Loop is referenced in this project as "lakeshore loop". Work on this loop is OPTIONAL Bid Items and includes crack sealing, asphalt seal coat, and 620 square feet of segmental retaining wall. The due date for questions remains March 3rd, 2026, at 10:00 a.m. Mountain Time. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued. Veterans Point Trail is an asphalt trail with metal railing and timber retaining walls that provide access from the parking area to fishing piers and viewpoints at Pactola Reservoir. The project will fill and seal cracks, reconstruct select sections, stabilize eroding areas, and apply a seal coat to the asphalt. Timber retaining walls will be removed and reconstructed with segmental concrete block retaining walls. Damaged pipe railing will be repaired and sections where railing is not needed will be eliminated. Reinforcement using gabion baskets will be constructed to repair eroded sections at the trail's edge and bridge abutments. Existing timber retaining walls will be removed and new larger retaining walls will be constructed. An overlook near the water's edge will be eliminated. Tables, benches, and pedestal fire grills will be removed. Optional work includes crack sealing, asphalt seal coat, and 620 square feet of segmental retaining wall on a 1,014 ft loop referenced as "Lakeshore Loop." The Trail is approximately 2,959 feet long, with a descent of approximately 50 feet from the parking lot to the lowest point, located on the North side of Pactola Reservoir Dam in Pennington County, South Dakota.

Post-Bid

Sidewalks / Parking Lot

$500,000.00

Public - Federal

Site Work

9

11

14

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
0
Bidding Soon
109
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2026

April 15, 2026

Project location map

To Be Determined, Custer, SD


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.