BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2026 at 7:00 PM

Updated February 28, 2026

Site work for a water / sewer project in Rankin Inlet, Nunavut. Completed plans call for site work for a water / sewer project.

Work under this contract consists of but not necessarily limited to fuel storage tank system upgrades at Rankin Inlet Adult Group Home as described in the contract documents (drawings and specifications). The Contractor shall complete the installation of the new storage tank system, and proper decommissioning and secure storage of existing to be removed equipment fuel tank by September 2026, and as noted in drawings and specifications. Documents can be obtained from https://www.nunavuttenders.ca/ Question Deadline 02/12/2026 Questions Regarding This Rft Should Be In Writing And Received By The Buyer

Bid Results

Water / Sewer

$735,700.00

Public - State/Provincial

Site Work

16

21

17

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
8
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2026

April 8, 2026

Project location map

Rankin Inlet, Rankin Inlet, NU

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.