BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 11, 2026 at 8:00 PM

Updated May 21, 2026

Site work, paving and outdoor lighting for a mixed-use development in Honolulu, Hawaii. Working plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; for paving for a transportation facility; and water / sewer project.

As per the Owner the project has been Postponed due to a Protest. This project will be rebid on a later date that has not yet been determined. The scope of work consists of asphalt concrete pavement reconstruction of Taxiway C and PCC pavement reconstruction adjacent to Hardstands A-E on the South Ramp, including asphalt overlay, storm drain replacement and repairs, 12-inch waterline replacement, and airfield electrical and lighting revisions. Responses to all questions and requests for information shall only be issued by formal addendum and posted to HIePRO. Bidders must submit and upload their complete proposal documents to HIePRO prior to the posted offer due date and time. Proposals received after the due date and time will not be considered. Any additional support documents designated as confidential and/or proprietary must be uploaded in separate files to HIePRO and should not be included in the proposal file. Failure to upload the required proposal documents will result in rejection of the bid. March 19, 2026, at 2:00 p.m All Request for Information (RFI) questions and Substitution Requests shall be submitted in HlePRO. RFI questions received after the stated deadline shall not be addressed. Substitution Requests received after the stated deadline shall not be considered. Verbal RFI(s) shall not receive a response. To be eligible for award, bidders shall possess a valid State of Hawaii General Engineering "A" Contractor's license prior to the award of contract. The estimated cost of construction is between $105,000,000.00 and $115,000,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Water / Sewer

$115,000,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

232

13

323

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
56
Bidding Soon
338
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2026

January 1, 2027

Project location map

300 Rodgers Blvd, Honolulu, HI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.