Renovation of a transportation facility in San Bernardino, California. Completed plans call for the renovation of a transportation facility.

Scope of Services This scope outlines the work required for the removal of Ticket Vending Machines (TVMs) along the SBX route. All activities will be performed during non-operational hours (Sundays) to avoid disruption to service. Question Deadline 02/18/2026 at 3:00 PM PT All questions or clarifications must be submitted through Omnitrans online bidding system Project Duration Omnitrans intends to award the Contract for a one (1) year base period. This scope outlines the work required for the removal of Ticket Vending Machines (TVMs) along the SBX route. All activities will be performed during non-operational hours (Sundays) to avoid disruption to service. Tasks to be Completed: o Electrical Disconnection and Removal: o D-e energize and confirm all power to the TVM circuit is turned off. o Perform Lockout/Tagout procedures o Disconnect and terminate all electrical and data connections o Pull all wiring back to the electrical panel. o TVM Removal: o Remove all existing TVMs from the platform. o Transport the removed units to the designated Omnitrans facility. o Structural Modifications: o Cut six (6) all-thread studs flush with the existing concrete decking. o Remove existing dry-packed concrete around the TVM bases as necessary. o Site Restoration and Cleaning: o Power wash and clean the entire platform area post-removal. o Ensure the site is left in a safe, clean, and presentable condition. o Electrical Box Protection: o Secure and properly cover all exposed electrical boxes located beneath the former TVM installations. o Drop off locations for TVM's o 234 South I St. San Bernardino, CA 92411 o This is a prevailing wage project, and a licensed electrical contractor is required Scheduling Requirements: All work must be performed on Sundays only, in alignment with SBX route non-operational days. Locations: 22 TVM's 10543 Anderson St. Loma Linda, CA 92350 11214 Anderson St. Loma Linda, CA 92354 25725 1/2 Barton Rd. Loma Linda, CA 92354 11275 Benton St. Loma Linda, CA 92354 113 S E St., San Bernardino, CA 92401 2205 N E St. San Bernardino, CA 92405 1205 N E St. San Bernardino, CA 92410 2179 N E St San Bernardino, CA 92405 2342 N E St San Bernardino, CA 92405 3223 N E St San Bernardino, CA 92405 1402 N Kendall Dr. San Bernardino, CA 92407 2490 Kendall Dr. San Bernardino, CA 92407 3213 N Kendall Dr. San Bernardino, CA 92407 975 W Kendall Dr. San Bernardino, CA 92407 4614 N University Ave. San Bernardino, CA, 92407 1195 S E St San Bernardino, CA 92408 1365 S E St. San Bernardino, CA 92408 937 S E St. E San Bernardino, CA 92408 1594 Highland Ave. San Bernardino, CA 92411 1080 E Hospitality Ave. San Bernardino, CA 92408 692 E Hospitality Ave. San Bernardino, CA 92408 1850 S Tippecanoe Ave. San Bernardino, CA 92408 End of Scope of Work

Post-Bid

Transportation Terminals

$350,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
624
Active Projects
319
Bidding Soon
4,027
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2026

April 16, 2026

Project location map

Multiple Locations, San Bernardino, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.