BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 2, 2026 at 7:00 PM

Updated February 3, 2026

Site work and paving for a mixed-use development in Cambridge, Illinois. Conceptual plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on May 5, 2026, at 10:30 AM at the Region Two/District Two Office in Dixon Phase I and II engineering services are required for the preparation of a project report (anticipated to be a categorical exclusion) and Phase II contract plans for the improvements on IL 82 from 0.4 Mi S of I-80 to IL 81 approximately 8.84 miles in length. The proposed improvements include the removal, replacement and/or extension of approximately 25 AR culverts, multiple sideroad and entrance culverts, hydraulic surveys and analyses, minor intersection improvements, add paved shoulders, guardrail improvements, ditching ROW survey and final plat documents, coordination with resource agencies, and preparation of cost estimates. It is anticipated that an in person public involvement meeting may be necessary. Phase I may include the preparation of a Project Report, Traffic Management Analysis (TMA), Hydraulic Reports, crash analysis, Type, Size and Location (TS&L) drawings, cross sections, and typical sections, plan and profile sheets, SGRs, environmental coordination, ESR, Photo Log of structures and culverts, Bridge Bat Assessment (BBA) inspections of culverts, preparation of ROW documents and related material. Coordination with other agencies is anticipated with this project. Phase II may include the preparation of detailed contract plans and all associated material, structure plans, roadway plans, typical sections, erosion control plans, cross sections, special details, special provisions; quantities, cost estimates, estimate of time, Maintenance of Traffic (MOT), prepare PESA Response submittal, Wetland Impact Evaluation (WIE), Cultural Coordination, Traffic Management Plan (TMP), Storm Water Pollution Prevention Plan (SWPPP) and the preparation of SGRs and all other incidental work required to complete the project. Coordination with other agencies is anticipated with this project. The Department will furnish the Consultant with any available as-builts/existing plans, topo survey, recent inspection reports, traffic data, soils boring data, crash data, and any other available information. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS) ILDOT - 032 - RFQ Engineering - IL 82 from 0.4 Mi S of I-80 to IL 81, Phase I/II Project

Conceptual

Roads / Highways

$15,215,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
0
Bidding Soon
722
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2027

Project location map

IL-82, Cambridge, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.