Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 2, 2026 at 7:00 PM
Updated February 3, 2026
Site work, paving and outdoor lighting for a mixed-use development in Benton, Illinois. Conceptual plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 30, 2026, at 10:00 AM at the Region Five/District Nine Office in Carbondale. Phase I/II engineering services are required to perform work associated with the reconstruction and resurfacing of IL 37 in Benton from IL 14/Bailey Lane to the south Benton city limits in Franklin County. Reconstruction of IL 37 includes pavement resurfacing, pavement patching, curb & gutter, sidewalk, bicycle accommodations, entrance and sideroad improvements, storm sewer, traffic signals, lighting and pavement markings. Phase I is expected to include the preparation of a Project Report (anticipated to be a categorical exclusion), location/drainage studies, pedestrian/bicycle studies, environmental impacts and coordination, data collection, cost estimates, pavement design, surveys (roadway), typical sections, utility conflicts and relocations, and subsurface utility engineering (SUE) Level B and Level D. Public Involvement is expected to include stakeholder and agency coordination, and the preparation of exhibits and all other materials for these meetings and coordination with resource agencies and/or special interest groups. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Special Studies (Location Drainage) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). ILDOT - 66 - RFQ Engineering - IL 37 From the Intersection of IL 14/Bailey Lane to the South City
Conceptual
Roads / Highways
$18,000,000.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 19, 2027
IL-37, Benton, IL
Related To This Project
Benton, IL
Bid Date: Feb 11 2026
Benton, IL
Bid Date: Feb 11 2026
Benton, IL
Bid Date: Feb 18 2026
Benton, IL
Bid Date: Mar 25 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
