BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2026 at 7:00 PM

Updated March 5, 2026

Site work for a development in Belfield, North Dakota. Completed plans call for site work for a development.

Est. Value Notes: $400k - $500K *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. furnishing of materials, labor, equipment and skill required for the construction of Crushing and Stockpiling Gravel and incidental items in and for said Billings County, as is more fully described and set forth in the project manual therefore, which are now on file in the office of the Billings County Auditor. No pre-bid meeting scheduled 1 Lsum Contract Bond; 60 Ea Removal of Trees; 450 Lf Removal of Bushes; 1 Lsum Strip & Stockpile Topsoil & Overburden; 60,000 Cy Crush & Stockpile Gravel; 1 Lsum Reclaim Pit Site; 1 Lsum Mobilization *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received after 22nd Feb 2026 may not be answered.

Bid Results

Conservation and Development

$352,654.00

Public - County

Site Work

3

7

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
0
Bidding Soon
57
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2026

April 2, 2026

Project location map

Multiple Locations, Belfield, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.