BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 16, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of a playground / park / athletic field in Rocklin, California. Completed plans call for the renovation of a playground / park / athletic field.

Sealed bids are requested for the "Night Ridge Park Playground Replacement" Project. Bids must be submitted with the project name clearly stated on the envelope, including the company name and address. If a mandatory pre-bid conference is listed, attendance at the entire pre-bid meeting and project walk-through is required for bidding eligibility. Subcontractor attendance is optional but encouraged. Addenda will be issued in response to questions at the meeting, and only statements confirmed by Addenda are binding. Site access prior to the bid is restricted and requires City approval and accompaniment. Contract Documents must be obtained in full from the City, either for purchase or free online download, and must be used for preparing bids. Written questions must be directed as specified. Bids are at the bidder's expense. Bids must be submitted on provided forms by the stated deadline; late bids will not be opened. Each bid must include appropriate bid security. The successful bidder may need to provide Material and Labor Payment and Performance Bonds, each for 100% of the Contract Price, depending on the bid amount. The City reserves the right to award contracts to the lowest responsible bidders, reject any or all bids, and waive inconsequential irregularities. This is a public works project requiring registration and compliance with California Labor Code and prevailing wage laws. Question Deadline 02/18/2026 at 3:00 PM PT: Written questions regarding this Invitation for Bids should be directed to Tim O'Connor, Parks Supervisor by email at tim.oconnor@rocklin.ca.us TOTAL CONTRACT TIME: 60 Days The City is seeking informal bids to remove the existing play structure and install a replacement play structure (furnished by the City). The project will consist of: o Demolition and disposal of existing play structure o Equipment installation to plan per 25_7727_NightRidgePark_004 DIM Plan specification o Re-installation of EWWF and Top Off o CPSI Inspections for both structures o Bonding Fees The scope of work is described more fully in Exhibit A to Construction Agreement for Construction. Total shall include all tools, labor and materials needed to complete the project including traffic control. Demolition & Disposal Remove and dispose of existing structures that are indicated for removal. The playground equipment to be removed becomes the property of the Contractor. Temporary Site Security Furnish, install, and later remove temporary chain-link security fencing around the construction zone for the duration of the project. Location: 6164 Frost Ridge Way, Rocklin, CA 95765

Award

Playgrounds / Parks / Athletic Fields

$93,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
385
Active Projects
217
Bidding Soon
2,640
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2026

March 30, 2026

Project location map

6164 Frost Ridge Way, Rocklin, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.