BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 16, 2026 at 7:00 PM

Updated February 17, 2026

Site work and paving for a road / highway in Caledonia, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The construction of 68th Street will be completed while under closure to through traffic. Detour signage and traffic control devices shall be placed according to the construction detour signage shown on the Detour Plan or from the Traffic Control Plan submitted and approved by KCRC. The signage must be maintained throughout the project. The contractor is required to inspect all signs and other traffic control items daily. Access to homes, businesses and intersecting streets within the project limits shall be maintained at all times. Access for safety vehicles shall be maintained as well. The Contractor shall also maintain communication with the local emergency agencies. The Contractor will use material such as gravel, HMA millings or other satisfactory material as directed by the Engineer and will not be paid for separately. Any deviation from this must be approved by the Engineer. The Contractor must communicate with and get property owner approval any time that access to property will be impacted due to the Construction. Maintaining traffic shall be in accordance with section 812 of the Standard Specifications for Construction and this Special Provision. All signing shall conform to the 2025 edition of the Michigan Manual of Uniform Traffic Control Devices (MMUTCD). Payment for the cost of maintaining access to driveway approaches within the construction area will not be made separately and is included in the prices bid for other items of work. The contractor shall adhere to the attached detour plan, any changes to the detour shall be submitted to KCRC for approval. Reference Number 0000411380 Bid Intent Optional Bid Intent Deadline 02/17/2026 08:30 AM EST Completion Date: October 30, 2026 Progress schedule, enclosed, must be completed and submitted with bid pricing sheet. No work shall begin before April 1, 2026 unless approved by the engineer. Question Deadline 02/12/2026 at 9:00 AM ET Questions are submitted online Yes, If you have questions, please reach out to purchasing@kentcountyroads.net. Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The contract is scheduled for consideration and potential award by the Board on Tuesday, February 24, 2026. The Board reserves the right to reject any or all bids, to waive any irregularities in the bidding process, and to accept the bid or bids deemed, in its sole discretion, to be most advantageous and in the best interest of the County.

GC Bidding

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
258
Active Projects
175
Bidding Soon
1,418
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

April 1, 2026

Project location map

68th St SE, Caledonia, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.