BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2026 at 7:00 PM

Updated February 4, 2026

Demolition and site work for a mixed-use development in Dayton, Ohio. Working plans call for the demolition of a medical facility; and for site work for a medical facility.

This project requires the complete demolition of two brick buildings, designated as Buildings 149 and 150, which have suffered total roof collapses resulting in severe structural damage to the exterior supporting walls. Due to the extent of deterioration, both structures are beyond repair and must be fully demolished, including all roof components and exterior wall systems. Building 149 is located within a confined courtyard surrounded by adjacent facilities and connecting corridors, requiring additional planning for access, safety, and demolition operations. All work must be completed within 120 calendar days from the notice to proceed, and the contractor must coordinate all activities with the COR at least two weeks in advance to ensure uninterrupted operation of the medical center. Work may occur during normal business hours or after hours and weekends as appropriate, with normal work hours defined as 7:00 a.m. to 4:30 p.m., Monday through Friday. Plans, specifications, and solicitation documents will be available electronically at no cost. This procurement is restricted to Service-Disabled Veteran-Owned Small Businesses. The Method of Contractor Selection has not been determined at this Time.

Final Planning

Medical

$300,000.00

Public - Federal

Demolition, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
331
Active Projects
199
Bidding Soon
2,311
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2026

April 6, 2026

Project location map

4100 W Third St, Dayton, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.