BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a water / sewer project in Athens, Georgia. Completed plans call for site work for a water / sewer project.

As of May 12, 2026, this project has not yet been awarded. A timeline for the award has not yet been established. Responsible General Contractors are to provide all construction, materials, equipment, and labor to complete the Middle Oconee East Truck Sanitary Sewer Improvements - Phase 1A. The work shall replace an aging 30-inch concrete pipe trunk line and manholes located along the Middle Oconee River with a proposed 48-inch ductile iron pipe (DIP) and new 9ft diameter precast structures. This includes the installation of approximately 4,250 linear feet (LF) of 48-inch Ductile Iron Pipe, approximately 50 LF of 16-inch Ductile Iron Pipe, approximately 200 LF of 12-inch Ductile Iron Pipe, and 400 linear feet of 72-inch casings with anchors for stream crossings (some jack and bore), and 26 precast concrete manholes. The work starts at the Middle Oconee Water Reclamation plant and ends in the vicinity of the Macon Highway Bridge over the Middle Oconee. Some work shall be new trench work located parallel to existing facilities, but most shall be same trench replacement. There is one approximately 160 linear foot jack and bore under Macon Highway. All interconnections to the trunk line shall be replaced a minimum 50 LF upstream from the trunk line with 12-inch Ductile Iron Pipe or larger and a manhole installed. Work shall also include erosion control and landscaping, several creek crossings, groundwater dewatering, as well as repair or replacement of pavement, sidewalk, fences, and curbs. Large scale bypass pumping is required for the duration of the project. Traffic control and large scale bypass pump-arounds are included in the project scope. All work shall be performed as shown on the Drawings and as specified. Pre-qualification requirements: Contractors must provide applications in accordance with the Georgia Local Government Public Works Construction Law (the Georgia Public Works Law). The estimated project construction value range is $10,500,000 to $11,500,000 US Dollars for the construction of the gravity sewer lines and other necessary appurtenances. ACCGov reserves the right to split the contract work into phases to accommodate project schedule and to eliminate or add to any portion of any of the designated lines *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 02/20/2026 at 3:00 PM ET No interpretation of the meaning of this RFPQ will be made to any Applicant verbally. Every request for such interpretation should be made in writing and addressed to Rena Durie, Senior Buyer, at 772-400-6066, or accbids@accgov.com.

Post-Bid

Water / Sewer

$11,500,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
275
Active Projects
120
Bidding Soon
1,534
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.