BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 12, 2026 at 8:00 PM

Updated March 13, 2026

Remodeling and renovation of a military facility in Norfolk, Virginia. Completed plans call for the remodel of a military facility; and for the renovation of a military facility.

NATO established Headquarters Supreme Allied Commander Transformation (HQ SACT) in Norfolk, VA, in 2003 to lead warfare development efforts and improve military capabilities to meet 21st century security and defense requirements. This work encompasses the need to enhance the Alliance's ability to apply a comprehensive approach to the conduct of future operations and engagement with partners, NATO's interaction with non-NATO entities that include states, non-state actors, international and non-governmental organizations. Background and Scope of Work. The Headquarters Support Branch requires a qualified construction contractor to perform interior renovations in support of a new video studio and office environment. The work includes selective demolition; installation of a glass wall separating a soundproofed video production control room from a soundproofed video and photographic studio; construction of a new enclosed partition wall; and integration of two-way communication systems between the rooms. The project also includes replacement of carpet tile flooring within the renovated spaces and an adjacent open office area. All work shall be performed in accordance with applicable building codes, safety regulations, and recognized industry standards. The Contractor shall furnish all labor, materials, equipment, and tools necessary to complete the work. The Contractor is responsible for maintaining site protection, implementing dust control measures, and performing final cleanup upon completion of construction. Location: Headquarters, Supreme Allied Commander Transformation (HQ SACT), 7857 Blandy Road, Suite 100, Norfolk, VA 23551 Q/A:- Prospective Bidders should seek clarification at their earliest convenience. Any explanation regarding the meaning or interpretation of this RFP, terms, clause, provision or specifications, shall be requested in writing, from the Contracting Officer. All Contracting Officers listed on this RFP must receive such requests via email for clarification no later than 11 February 2026. Period of Performance. Contract Award to 30 April 2026 Demolition and Disposal o Supply and install all required materials for the demolition of a wall separating the video production room and the video/photographic studio. o Demolition of the entrance wall to the video production room. o Remove and properly dispose of all construction debris offsite. o Maintain a clean and safe worksite. o Comply with applicable codes, regulations, and safety standards. o Coordinate with HQ SACT to minimize disruption to adjacent operations. o Removal/movement of HVAC systems may be required o Any other identified demolition/disposal as required. 2 Glass Wall Installation o Supply and install one (1) soundproof glass window with integrated voice communications pass-through to support video studio functions. o Glass must be commercial-grade, tempered, soundmitigating, with framing and finish trim. o 2-way intercom installed and wired in to power. o Communications components to be integrated and tested. 3 New Partition Wall Construction o Construct one (1) new framed wall with appropriate finish (e.g., gypsum board, taped, sanded, painted). o Include necessary door frame and hardware if required. 4 Wall Repair and Repainting o Nail holes and other damage shall be repaired along all walls in the print shop, engraving room, video studio control room and renovated tv/photo studio. o Paint will be eggshell base - color platinum (color code will be supplied on request). o Rooms to be painted print shop, engraving room, video studio control room. o Any other repairs required upon inspection. 5 Flooring o Remove and replace approximately 500 square meters (20m x 20m) of existing carpet tile. Filled in blue area on picture. o Remove existing flooring and prepare engraving room for laying LVP flooring o Lay LVP flooring in engraving room o Supply and install new commercial-grade carpet tile with adhesive per manufacturer's recommendations. o Provide HQ SACT with material samples for approval prior to ordering. o Conduct repairs as needed to the subflooring. 6 Cove Base o New cove base added to print shop, engraving room, video studio control room. o Color shall be moonrock samples and can be shown on request. o Conduct repairs as needed. 7 Ventilation/HVAC o Movement/reinstalling of all necessaryHVAC/ventilation as required. 8 Electrical o Provision of sufficient electrical outlets as required.

Award

Military

$143,668.00

Public - Federal

Remodeling, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2026

March 25, 2026

Project location map

7857 Blandy Rd, Norfolk, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.