BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 11, 2026 at 8:00 PM

Updated May 21, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Robbinsville, New Jersey. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Question Deadline 02/11/2026 at 4:00 PM ET E-mail Questions to: Imaldonado@mercercounty.org or via online. Questions Submitted After the Deadline Shall Have No Bearing on the Project Bid Proposals Must Be Accompanied by a Certified Check, Cashier's Check, or Bid Bond in the Amount of a Ten Percent (10%) of the Bid Price but Not in Excess of $20,000.00 and Made Payable to the County of Mercer. If Bids Are to Be Submitted Electronically in Accord With This Notice, Then the Bidder Shall Submit a Copy of the Bid Guarantee With Electronic Submittal, and Mail (Ensuring Receipt Prior to Electronic Bid Opening) the Original to the Department of Purchasing, 640 S. Broad Street, Room 321, Trenton, New Jersey 08611. All Interested Bidders Should Check the Website From Now Through Bid Opening. It is the Sole Responsibility of the Respondent to Be Knowledgeable of All Addenda Related to This Procurement. Bidders Are Required to Comply With the Requirements of N.j.s.a.10:5-31 Et Seq. And N.j.a.c. 17:27. County of Mercer, New Jersey Purchasing Department 609 989 6710 The work to be performed under this contract includes, but is not necessarily limited to, the demolition and removal of the existing and any previous bridge superstructure and substructure, including all appurtenances to the extents shown on the plans. The demolition and removal will include the complete removal of all existing and previous abutments and foundations, whether shown on the plans or not. Any existing piles that interfere with proposed pile locations are to be removed completely in accordance with the plans. The construction of a temporary cofferdam and maintaining stream flow shall be in accordance with section 501 of the Specifications. During removal operations, temporary shielding shall be used to prevent material from falling into the stream. Temporary turbidity barriers shall be installed in the stream to control downstream turbidity and to allow for dewatering of the work area and installation of the piles and precast concrete abutments. Structural work includes, but is not limited to, construction of concrete foundations, installation of a prefabricated reinforced concrete three-sided rigid frame structure, concrete wingwalls, concrete deck, concrete sidewalks, concrete approach slabs, concrete bridge barrier and parapet, and a polyester polymer concrete overlay

Bid Results

Bridges / Tunnels

$1,519,000.00

Public - County

Demolition, New Construction, Paving, Site Work

40

4

4

6

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,053
Active Projects
549
Bidding Soon
8,225
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2026

April 29, 2026

Project location map

Windsor Rd, Robbinsville, NJ


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.